Active SLED Opportunity · COLORADO · REGIONAL TRANSPORTATION DISTRICT

    Rail Infrastructure Work Program

    Issued by Regional Transportation District
    localRFIRegional Transportation DistrictSol. 278483
    Open · 26d remaining
    DAYS TO CLOSE
    26
    due Aug 31, 2026
    PUBLISHED
    Jul 28, 2026
    Posting date
    JURISDICTION
    Regional Transportation
    local
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    RTD seeks industry feedback via RFI for contractors and vendors with expertise in full-depth rail reconstruction, interim repairs, and modernization of its light rail system while maintaining operations. The focus is on extending asset life and minimizing service disruption.

    Opportunity details

    Solicitation No.
    278483
    Type / RFx
    RFI
    Status
    open
    Level
    local
    Published Date
    July 28, 2026
    Due Date
    August 31, 2026
    NAICS Code
    237310AI guide
    Agency
    Regional Transportation District

    Description

    RTD plans to seek a contractor with demonstrated expertise from contractorsmanufacturers, and vendors with demonstrated products, skills and expertise to conduct full-depth reconstruction, interim repairs (when necessary) and prepare for future modernization while keeping the existing system operational to the greatest extent possible.  This RFI is NOT seeking to engage with design professionals.  This RFI is being used to collect industry feedback regarding the general project approach and how the project schedule can be accelerated.

    Background

    The Regional Transportation District (“RTD” or the “District”) is in the early stages of planning defined cycles of light rail renewal, modernization, support for high-volume events work, and investments undertaken in cooperation with other entities.   

    By this Request for Information (RFI) RTD is seeking information from contractors, manufacturers, and vendors with demonstrated products, skills and expertise to conduct full-depth reconstruction, interim repairs (when necessary) and prepare for future modernization while keeping the existing system operational to the greatest extent possible.  This RFI is NOT seeking to engage with design professionals.   

    RTD has launched a new Strategic Initiative called Building a Better RTD which includes elements of Advancing Infrastructure work. Planning for full-depth rail reconstruction involves building reasonable alternatives for customers and delivering the maximum amount of reconstruction within the scheduled shutdowns. The intent is to implement full-depth rail reconstruction work in an impacted segment all at one time, so that the lifespan of the rail assets can be reset, and the segment does not see a disruption for reconstruction for another 30 years.  Interim corrective actions may also be required on the system, but the main priority for RTD is to identify the most efficient manner to conduct full-depth rail reconstruction at key locations. If any system improvements are needed and feasible, those should also be undertaken at the same time.   

    Interested contractors, manufacturers, and vendors are requested to review the outline scope for the first focus area and complete the Respondent Questionnaire. Following the RFI Submittal due date, RTD may hold individual 1-on-1 meetings with Respondents if a Respondent requests. During the 1-on-1 meetings, Respondents may ask additional questions about the project and provide additional information regarding the Respondent’s RFI Submittal. One (1) hour will be allotted for each 1-on-1 meeting and the meetings will be held remotely. Scheduling of 1-on-1 meetings will be based on mutual availability.    

    Responding to this RFI will provide contractors, manufacturers, and vendors the opportunity to engage with RTD staff prior to solicitations being issued, so RTD can incorporate their suggestions and feedback. Responding to this RFI is NOT a prequalification.  Not responding will not affect any firm’s capability to apply for any subsequent solicitation. 

    RTD plans to use information obtained from this RFI to develop scopes of work and associated contract provisions to contract with one or more vendors.  The ensuing contracts may be on-call work order type, or other contractual mechanisms.   

    The Rail Infrastructure Work Program will encompass all elements of rail Systems, including the vehicle interface.  The term “Systems” as used in this RFI pertains to Traction Power Electrification, Signaling, Systemwide Electrical, Communications, and the Vehicle interface. 

    It is intended for the geographic extent of the work to be all of the RTD rail system, except the A, B, and G lines which are maintained through a long-term concessionaire agreement.  The initial focus will be on the Light Rail System. 

    The services RTD may contract for are: 

    • Performing full-depth reconstruction of rail lines 
    • Interim corrective repairs as needed 
    • Performing system modifications 

    Three potential future scopes of work identified for reconstruction are described within in an outline form in the Scope of Work Section, exhibits, and with some additional details.  RTD will fund the scope through the Agency’s Asset Management Program run capital project planning process.  

    EXISTING SYSTEM INFORMATION 

    RTD is a political subdivision of the State of Colorado, United States of America responsible for developing, maintaining, and operating a mass transit system for the benefit of its service area. The RTD service area encompasses portions of the eight-county region including the City and County of Broomfield, the City and County of Denver, the Counties of Adams, Arapahoe, Boulder, Douglas, Jefferson, and Weld.  The service area is 2,345 square miles.   

    The RTD opened its first electrified rail line in 1994.  Since then, 114 miles of rail have been constructed at various points in time.  RTD runs both Light Rail and Commuter Rail.  System characteristics are below.   

    Technology 

    Miles of track 

    Stations 

    Overhead Catenary system 

    Regulator 

    Light Rail 

    60.1 

    57 

    750 Volts Direct Current 

    Colorado Public Utilities Commission 

    Commuter Rail 

    54.1 

    27 

    25,000 Volts Alternating Current 

    Federal Railroad Administration 

     

    All highway rail grade crossings on Commuter Rail are also under the purview of Colorado Public Utilities Commission.  

    The initial reconstruction work is expected to be on the Light Rail system. See Exhibit A of Attachment E - Supplemental for 926DR013 RFI Rail Infrastructure Work, for a Light Rail System map .  Based on age considerations, segments of Lines D, E, H, and W have been identified for planning reconstruction work.

    RAIL RECONSTRUCTION PROGRAM GOALS 

    1. Prioritize implementation of full-depth rail reconstruction and systems work so that the lifespan of rail assets can be reset, and the segment does not see a disruption for reconstruction for another 30 years.

    2. Keep rail and systems elements in a condition ready to deliver service, operating at a full level of performance, minimizing impact on service delivery.

    3. Explore modernization needs and not preclude them. Work towards modernization as feasible.

    4. Provide customers with advance notice of planned disruptions and provide alternative service.

    5. Once a rail segment is shut down, update all infrastructure and related systems to the extent possible.

    6. Optimize the work that needs to be done with shutdowns required.  

    7. Program Standards

    a. For trackwork, full depth reconstruction is the goal, to reset expected useful life, and to align with Agency capital project funding expectations.  Interim fixes may be implemented if conditions warrant.

    b. For systems work, the program standards are in development.  RTD is currently undertaking a RFQual 126DR008: Light Rail Systems Asset Management Gap Assessment and Implementation Plan study.  The systems gap assessment is intended to define the system, identify current condition and performance, document dependencies, and establish the plan to achieve compliance and readiness.

    c. RTD will also incorporate lessons learned from the Downtown Denver Rail Reconstruction Project, currently underway.

    Project Details

    • Reference ID: RFI 926DR012
    • Department: Rail Operations
    • Department Head: Dave Jensen (Assistant General Manager, Rail Operations)

    Important Dates

    • Questions Due: 2026-08-17T20:00:00.000Z
    • Answers Posted By: 2026-08-24T22:00:00.000Z
    • Pre-Proposal Meeting: 2026-08-10T17:00:00.000Z — Via Microsoft Teams (copy http address below and paste in browser): Join: https://teams.microsoft.com/meet/26140464442873?p=iIzwOQKPkMoiOIAI01 Meeting ID: 261 404 644 428 73 Passcode: PM9Xy6vh

    Evaluation Criteria

    • RFI Schedule
      RFI advertised.:July 28, 2026
      Project Overview to take place remotely via Microsoft Teams. Open to all Respondents. (Non-Mandatory):August 10, 2026, 11:00am

      Via Microsoft Teams (copy http address below and paste in browser):

      Join: https://teams.microsoft.com/meet/26140464442873?p=iIzwOQKPkMoiOIAI01
      Meeting ID: 261 404 644 428 73
      Passcode: PM9Xy6vh

      Inquiry Period. Questions due by via RTD’s online procurement portal, OpenGov.:August 17, 2026, 2:00pm
      Answers to Questions to be sent to potential offerors via RTD’s online procurement portal, OpenGov.:August 24, 2026, 4:00pm
      RFI Submittals Due to RTD, via RTD’s online procurement portal, OpenGov:August 31, 2026, 2:00pm
      Following the RFI Submittal due date, RTD may hold individual 1-on-1 meetings with Respondents if a Respondent requests. During :Week of: August 24, 2026, through August 27, 2026
    • RFI Scope

      See attached SUPPLEMENTAL INFORMATION FOR REQUEST FOR INFORMATION (RFI) 926DR012

       

    • General Information

      The Regional Transportation District (RTD) is a political subdivision of the State of Colorado responsible for developing, maintaining, and operating a mass transit system for the benefit of its service area. The RTD service area encompasses portions of the eight-county region including the City and County of Broomfield, the City and County of Denver, the Counties of Adams, Arapahoe, Boulder, Douglas, Jefferson, and Weld.

      RTD plans to seek a contractor with demonstrated expertise from contractorsmanufacturers, and vendors with demonstrated products, skills and expertise to conduct full-depth reconstruction, interim repairs (when necessary) and prepare for future modernization while keeping the existing system operational to the greatest extent possible.  This RFI is NOT seeking to engage with design professionals.  This RFI is being used to collect industry feedback regarding the general project approach and how the project schedule can be accelerated.

      The same information will be gathered from different vendors and may be used in the formulation of a future Request for Qualifications (RFQ) and / or Request for Proposals (RFP). Pricing data should not be included in your response. No contract will be awarded as a result of this RFI.

      RTD invites vendors capable of carrying out the proposed work included herein with this RFI to provide information regarding the services that meet the needs of RTD as described above and in the Draft Scope of Work. The outcome of this RFI would be an RFQ/RFP for the services described above and in the Draft Scope of Work.

      1. Addenda to RFI
        In the event that it becomes necessary to revise any part of this RFI, or if additional information is necessary to enable potential respondents to make an adequate interpretation of the provisions of this RFI, an addendum to the RFI will be provided to each recipient of this RFI.
      2. Pre-Submittal Meeting(s)
        RTD will host the Project Overview to be held remotely at the link provided above on Monday, August 10, 2026 (11:00 am). The Project Overview will be an opportunity for Respondents to ask questions about the project and the Draft Scope of Work.
      3. Inquiries
        Questions about this RFI shall be submitted to Purchasing Agent, Jill Pruett, due by 2:00 pm on Monday, August 17, 2026, via RTD’s online procurement portal, OpenGov.
      4. Post Submittal Meeting(s)

        Following the RFI Submittal due date, RTD may hold individual 1-on-1 meetings with Respondents if a Respondent requests. During the 1-on-1 meetings, Respondents may ask additional questions about the project and provide additional information regarding the Respondent’s RFI Submittal. One (1) hour will be allotted for each 1-on-1 meeting and the meetings will be held remotely. Scheduling of 1- on-1 meetings will be based on mutual availability.

        From the issuance date of this RFI, Jill Pruett, Procurement Specialist I, is the sole point of contact for RTD and RTD’s project team members concerning this RFI.

        Respondents’ questions must be submitted in writing via RTD’s online procurement portal, OpenGov. All requests for clarifications must be made during the Inquiry Period. RTD has no obligation to respond to questions or requests for clarifications that are not submitted in writing and/or submitted outside of the Inquiry Period. Except as provided below, RTD’s responses to all inquiries properly submitted will be answered in the form of an addendum that will be provided to all recipients of this RFI via RTD’s online procurement portal, OpenGov.

    Submission Requirements

    • SECTION 1 Respondent Information
    • Company name (required)
    • Headquarters address (required)
    • Contact name, telephone, and e-mail address (required)
    • Company website URL (required)
    • Number of Transportation customers (required)
    • Number of public sector customers (required)
    • Year founded (required)
    • Number of employees (required)
    • SECTION 3 General Questions
    • Are there any known supply chain issues that could affect this project? (required)
    • Draft Scope of Work Feedback (required)

      Prospective proposers are encouraged to comment on the following requirements of the Draft Scope of Work and/or provide alternative means of compliance to best match the intended use case above. Refer to the  Draft Scope of Work for additional details.

      1. Contractor’s General Responsibilities
      2. Track Replacement 
      3. Ancillary Rail Systems Work 
      4. Station Accessibility Improvements 
        1. Areas A through C – High block replacement 
        2. Tactile Warning Strip 
        3. Area A 
      5. Station Electric Improvements 
      6. Engineering Design and Design Services During Construction
        1. Responsible charge by qualified personnel 
        2. Design Criteria 
        3. Sub-surface utility engineering 
        4. Technical Specifications 
        5. Coordination with other adjacent construction 
        6. CAD files 
      7. Construction 
      8. Safety and Security Certification 
        1. Preliminary Hazard Analysis (PHA) 
        2. Threat and Vulnerability Analysis and Resolution (TVA) 
        3. Emergency Preparedness and Response 
        4. Operational Risk Management (ORM) 
        5. Certifiable Items List 
        6. Integrated Testing 
      9. Project Management by Contractor 
        1. Project Initiation 
        2. Communication Procedures 
        3. Document Control/Information Management 
        4. Quality Assurance/Quality Control 
      10. Stakeholder Engagement and Outreach Plan 
      11. Post-Mortem Evaluation of Existing Rail 
    • Draft Specifications Feedback (required)

      Please provide any suggestions to:

      1. Extend target design life beyond 30 years
      2. Make repair and replacements easier 
      3. Make maintenance easier 
      4. Reduce the time to construct 
    • Additional Information
    • Open Records Copy of Response

      Submit your Open Records Copy per the instructions in this solicitation.

    • Supporting Documentation

      Respondents may provide supporting documentation with their RFI Submittals, such as marketing brochures, product fact sheets, technical documentation, etc.

    Key dates

    1. July 28, 2026Published
    2. August 31, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.