SLED Opportunity · GEORGIA · GEORGIA

    Rebid Hard Labor Creek Reservoir Apalachee River Intake

    Issued by Walton County Water And Sewerage Authority
    stateRFPgeorgiaSol. PE-99658-NONST-2026-000000005
    Closed
    STATUS
    Closed
    due Apr 23, 2026
    PUBLISHED
    Mar 18, 2026
    Posting date
    JURISDICTION
    georgia
    state
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    Walton County Water & Sewerage Authority seeks bids for construction services including an in-river channel, concrete intake structure, road, grading, fencing, and landscaping for the Hard Labor Creek Reservoir Apalachee River Intake project. Bids due April 23, 2026.

    Opportunity details

    Solicitation No.
    PE-99658-NONST-2026-000000005
    Type / RFx
    RFP
    Status
    Open
    Level
    state
    Published Date
    March 18, 2026
    Due Date
    April 23, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    georgia
    State
    georgia
    Agency
    Walton County Water And Sewerage Authority

    Description

    REBID HARD LABOR CREEK RESERVOIR APALACHEE RIVER INTAKE Sealed bids will be received by the Walton County Water & Sewerage Authority for furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the Rebid Hard Labor Creek Reservoir Apalachee River Intake in Walton County, GA. Bids will be received at the Walton County Water & Sewerage Authority, 2171 Highway 81, Loganville, GA 30052 until 2:00 p.m. local time on Thursday, April 23, 2026. Any bid received after said time and date of bid opening will not be considered by OWNER. Bids will be publicly opened and read aloud at this time and location. All bids will be evaluated by OWNER and the project will be awarded, if it is awarded, within sixty (60) days of the bid opening. The Project consists of, but is not limited to the following major elements: Construction of an in-river channel to the intake structure, a cast-in-place concrete intake structure, an entrance road, grading, security fencing, landscaping, and additional associated work as specified and indicated in the contract documents. Time of completion for all work associated with Rebid Hard Labor Creek Reservoir Apalachee River Intake shall be THREE HUNDRED SIXTY-FIVE (365) consecutive calendar days of the date specified in a written ¿Notice to Proceed¿ from OWNER. Copies of Contract Documents, Specifications, and Construction Drawings may be obtained from Precision Planning, Inc. upon an email request for plans to Natalie Pifer 861np@ppi.us.

    Key dates

    1. March 18, 2026Published
    2. April 23, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.