Active SLED Opportunity · ARIZONA · CENTRAL ARIZONA PROJECT

    Recovery Capacity Study SOQ

    Issued by Central Arizona Project
    localSource SoughtCentral Arizona ProjectSol. 271654
    Open · 14d remaining
    DAYS TO CLOSE
    14
    due Jul 8, 2026
    PUBLISHED
    Jun 4, 2026
    Posting date
    JURISDICTION
    Central Arizona
    local
    NAICS CODE
    541330
    AI-classified industry

    AI Summary

    The Central Arizona Water Conservation District seeks engineering consulting firms for a Recovery Capacity Study to evaluate water recovery projects and develop facilities with 100,000 acre-feet/year capacity. Mandatory pre-submittal meeting on June 17, 2026. Proposals due by July 8, 2026.

    Opportunity details

    Solicitation No.
    271654
    Type / RFx
    Source Sought
    Status
    open
    Level
    local
    Published Date
    June 4, 2026
    Due Date
    July 8, 2026
    NAICS Code
    541330AI guide
    State
    Arizona
    Agency
    Central Arizona Project

    Description

    The Central Arizona Water Conservation District (CAWCD), is soliciting sealed Statements of Qualifications (SOQs) for Recovery Capacity Study. SOQs will be received on or before the day and time stated on the cover sheet. 

     

    CAWCD desires to enter into a contract with a professional engineering consulting firm (Consultant) to study and evaluate recovery projects in the three Active Management Areas (AMA) to develop direct recovery facilities with a total capacity of 100,000 acre-feet per year.  The desired result of these studies is a better understanding of possible recovery infrastructure projects to pump long-term storage credits for introduction into the CAP aqueduct.

     

    The effort to complete this work is expected to be considerable with specialists required in the areas of civil, structural, and geotechnical engineering; hydraulics, survey, and estimating.  CAWCD will supply existing information on CAWCD owned recharge facilities as necessary, however an extensive amount of field work and meeting/phone conferences with CAWCD personnel may be necessary.  This is anticipated to be a multi-phase project with this being considered phase one.  Additional phases may include exploratory well drilling or could lead directly into a construction phase for one or more facilities.

     

    A MANDATORY PRE-SOQ SUBMITTAL CONFERENCE will be held on June 17, 2026 at 9:00 AM at CAWCD Headquarters, and also available virtually via MS Teams. 

                          

    All prospective proposers are required to attend the pre-submittal conference.  Attendance is a condition of participation in the solicitation and failure to attend will disqualify a submitted proposal.  Failure to attend will not be grounds for protest or contract claim.

     

    Attendees must RSVP with Erin Reilly, Procurement Contract Administrator, at ereilly@cap-az.com no later than 4:00pm on June 16, 2026. Upon RSVP, confirmation with further instructions and link to virtual meeting will be provided.

     

    The purpose of this meeting will be to clarify the contents of this SOQ. CAWCD personnel will present background information on the recovery capacity analysis. Respondents will have an opportunity to ask questions.

     

    Any doubt as to the requirements of this SOQ, or any apparent omission or discrepancy should be presented to CAWCD at the Pre-Submittal meeting. CAWCD will then determine the appropriate action. If necessary, CAWCD will issue a written addendum to this SOQ.  Oral statements or instructions shall not constitute an addendum to this SOQ.

     

    Project Details

    • Reference ID: C116808
    • Department: Procurement-Goods & Services
    • Department Head: Maria Hernandez (Maria Hernandez)

    Important Dates

    • Questions Due: 2026-06-25T22:00:00.000Z

    Meetings & Milestones

    EventDateLocation
    Mandatory Pre-Submittal Meeting *(attendance required)*2026-06-17T16:00:00.000ZIn person meeting at CAP Headquarters or Virtual on MS Teams. MUST RSVP to ereilly@cap-az.com to receive instructions and link to virtual meeting. It is strongly recommended that at least one person from each firm attend in person.

    Evaluation Criteria

    • Project Understanding and Approach (40 pts)
    • Expertise, Qualifications, & Experience (30 pts)
    • Project Schedule (30 pts)

    Submission Requirements

    • Did you download the attachment and read through the entire Request for SOQ Document? (required)
    • Proposal Documents (required)

      Please Upload your COMPLETE Proposal here, in one (1) PDF document which includes the following:

      1. Completed Section D, Consultant Form
      2. Completed Section E, Questionnaire
      3. Evidence of financial stability
      4. Certificate of good standing from Arizona Corporation Commission (or other appropriate government regulatory agency) in the state incorporated. 
      5. A resolution from an officer of the corporation indicating that the person or persons submitting the proposal are legally authorized to bind the Respondent to a contract.
      6. Completed Addendums, if any
    • Proposal (without Cost Proposal) (required)

      Please Upload your COMPLETE Proposal here. Upload fee proposal separately in the next step.

    • Separate Cost Proposal (required)

      Confirm that your fee proposal is not attached in your Proposal and is attached separately here.

    • Bid Bond (required)

      Each bid shall be accompanied by a certified cashier’s check, or bid bond, in the amount of XXXXXof the total bid price, payable toCentral Arizona Project, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of 60 days from the date of the bid opening.

      Please scan and upload a copy of your bid bond/cashier's check. Bidder must also MAIL bid guarantee with a postmarked date no later thanWednesday, July 8, 2026 addressed to:

      Central Arizona Project
      Erin Reilly
      23636 N 7TH STREET
      Phoenix,AZ
      85024

      Please have the Bidder Name, Contract Title ("Recovery Capacity Study SOQ"), and Contract Number ("C116808") listed clearly on the outside of the envelope.

    • Contract Execution, Payment Bond, Performance Bond, and Certificate(s) of Insurance (required)

      The contract shall be executed by the successful bidder and shall be returned, together with the Payment Bond, Performance Bond and Certificate(s) of Insurance to Central Arizona Project so that it is received within 14 working daysafter the bidder has received the contract for execution. Failure to do so shall be just cause for forfeiture of the proposal guaranty.

    • Bid Bond (required)

      Will this solicitation require a bid bond?

    • Electronic Pricing Table (required)

      Would you like to have bidders respond to an electronic pricing table through ProcureNow?

      Some examples of of when to say "yes":

      1. This is a quote for goods or commodities
      2. This is a public works bid, with a pricing table that can be uploaded into ProcureNow from an excel spreadsheet
      3. Seeking services for hourly rate schedules
    • Separate Fee Proposal Upload (required)

      If you are NOT using the Electronic Pricing Table option, will you want your bidder to separate a Price Proposal from the rest of their Response? You'll want to do this if you open your bids initially WITHOUT showing price, and then come back in after a technical evaluation to unseal pricing later.

    • Evaluation Committee? (required)

      Will there be an evaluation committee to review the proposals and score them based on weights and multiple criteria?

    Key dates

    1. June 4, 2026Published
    2. July 8, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.