SLED Opportunity · MINNESOTA · MINNESOTA
AI Summary
RFP for mechanical engineering consultants to conduct a pre-design study for replacing the heating system with a ground source heat pump at MCF-Shakopee, focusing on cost-effectiveness, sustainability, and regulatory compliance.
RECS Project #78SH0060 - RFP for a qualified mechanical engineering consultants to prepare a comprehensive pre-design study evaluating replacement of the existing boiler and heating system with a Ground Source Heat Pump (GSHP) system at the MCF-Shakopee campus. The purpose of this pre-design is to determine the most feasible and cost-effective approach to reducing long-term utility costs, reducing greenhouse gas emissions, and meeting statutory sustainability requirements including B3, SB2030, and the applicable provisions of the 2023 Inflation Reduction Act (IRA) and 2025 OBBBA, MCF-Shakopee, Shakopee, MN. See attached RFP for additional details.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.