City of St. Petersburg seeks quotes for repair and raising of Maximo Boat Dock, including inspection, replacement of damaged materials, and reinforcement. Project aims to ensure safety and durability for public use. RFQ due by March 30, 2026.
The City of St. Petersburg is seeking quotes from qualified vendors to conduct a comprehensive inspection of damaged boards and supports at the Maximo Boat Dock, replace any rotted or broken materials, secure all components with corrosion‑resistant fasteners, and reinforce or level the structure as needed.
Maximo Park features a small dock that serves as a popular access point for visitors and is heavily utilized by the community. Over time, the structure has deteriorated to the point that it now presents safety concerns. To ensure continued safe use of the park’s waterfront amenities, the dock must be replaced with a new, durable structure that meets current standards and can withstand frequent public use.
This section evaluates the Proposer’s qualifications, relevant experience, and capacity to successfully perform the required services. Scoring will be based on the firm’s history of similar projects, technical expertise, organizational structure, key personnel credentials, and demonstrated past performance.
This section evaluates the Proposer’s proposed methodology for delivering the services, including processes used on similar projects and the approach envisioned for this engagement. Scoring will be based on the clarity and feasibility of the project plan, schedule, key activities, deliverables, and the proposed coordination process with the City’s Project Manager.
This section evaluates the Proposer's completed cost analysis and proposed fee for the project. Scoring will be based on the completeness, clarity, and reasonableness of the pricing information provided.
This section evaluates the Proposer’s status as an SBE, MBE, WBE, or combination, and the firm’s demonstrated commitment to outreach, inclusion, and utilization of small and minority-owned businesses in performance of the contract. Scoring will be based on documented outreach efforts, planned mentoring and capacity-building initiatives, and processes for inclusive subcontracting.
If you have submitted an application and it is pending, please send an email to osd@stpete.org. In the subject line- provide the solicitation number and due date.
If you have submitted an application and it is pending, please send an email to osd@stpete.org. In the subject line- provide the solicitation number and due date.
Please provide a letter certifying who is authorized to execute the agreement on behalf of Company.
Type N/A if not applicable.
Type N/A if not applicable.
The City has deemed the following contract terms to be non-negotiable. Vendor is advised that if it wishes to take exception to any of the terms contained or referenced in the contract, it must explicitly identify the term and the exception in its response to the solicitation. Vendor's stated exception to a non-negotiable contract term may disqualify it from consideration:
Please download the below document, complete, and upload.
Upload all other documents relating to this solicitation. Including but not limited to proposals/statements of qualifications, applicable bonds, warranty information, etc.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Q (Engineering): Does the City require the contractor to provide signed and sealed drawings as well as as builts?
A: The City sometimes ask for signed and sealed drawings but for this project its not need it.
Q (Permits): Has the City obtained all the necessary permits for this work. What permits are required to be obtained by Contractor?
A: The contractor's will have to get the permits for the project
Q (Budget / Engineers Estimate): What is the City's Engineers Estimate and Budget for this solicitation?
A: No engineering was used for this project
Q (Budget): What is the projected budget for this project?
A: We don't have a budget set for this but just looking at previous project that is similar to this project we're estimate $33K
Q (Bond): Please confirm there will be no bid bond just a payment and performance bond
A: No bid bond, just a public construction bond. Please see attachments.
Q (Permits): We understand the City requires the contractor to obtain the City Building Permit. Please confirm that the City Building department will not require Pinellas County Docks and Seawall permit or any USACE and SWFWD permit.
A: Typically, docks that are repaired or replaced within the same footprint are exempt from permitting requirements, though a letter of exemption may be required. The contractor will need to obtain a permit exemption letter from the Department of Environmental Protection, if applicable. No additional permits are anticipated.
Q (Please confirm the decking to be installed): During the pre-bid meeting we discussed the option of composite / wear decking. Please confirm the desired decking material
A: Composite.
Q (Railing): Please confirm no railing will be required anywhere along the new boardwalk
A: No Railing need it
Q (Dimensions): Project Specification 4.3 General Requirements section B states: ...construct a 27’-6” dock with specified walkways. However, measuring the existing boardwalk we are measuring about 100ft of boardwalk including the access section. Please confirm we are to replace the existing boardwalk reinstalling the exact same dimensions as the current 100ft long and 5ft wide boardwalk
A: Yes.
Q (Hardware): Please confirm if and what size of cleats the City would like to get installed
A: The City Of St. Pete staff will add on the cleats
Q (Mangroves): Please confirm that all mangroves are to remain as is and that the proposed boardwalk replacement foundation will not conflict with or impact the existing root systems.
A: all mangroves are to remain as is