Active SLED Opportunity · TEXAS · TEXAS
AI Summary
City of Waco seeks sealed bids for the Speegleville Bridge and roadway reconstruction project, including bridge construction, roadway widening, storm drain installation, and sidewalks. Bids due July 29, 2026.
RFB2026-023, Speegleville Bridge Over the Middle Bosque Replacement. Sealed Bids will be accepted at the City of Waco’sOperations Center, 1415 N. 4th Street, Waco, TX until 2:00 P.M., Wednesday July29, 2026. The dual effort of the City of Waco and TxDOT for the SpeeglevilleBridge Over the Middle Bosque Project is a 0.54-mile bridge and roadwayreconstruction project of Speegleville Road from Maple Shade Road to north ofOak Road located in the City of Waco, McLennan County, Texas. The projectconsists of reconstructing approximately 2,200 LF of roadway and adding anadditional northbound and southbound lanes, creating a four-lane roadwayseparated by a striped median. The bridge crossing consists of constructing twodifferent bridges elevated over the Middle Bosque River, each 670 feet inlength. In addition to roadway improvements, construction of approximately1,500 LF of storm drainpipes and culverts, and construction of pedestriansidewalks on the east and west sides of the roadway. For more detailedinformation, see this project page at https://waco-texas.bonfirehub.com/portal. A Non-mandatory Pre-Bid meeting is scheduled for WednesdayJuly 1, 2026, at 10:00 A. M. via Zoom Video and Dial In. For questions, pleasecontact purchasing agent Paul Campos at pcampos@wacotx.gov or by phone at254-750-8062.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.