SLED Opportunity · GEORGIA · GEORGIA
AI Summary
RFQ for preconstruction engineering design services for the West King Road Connector Pedestrian Bridge project in Hampton, Georgia, including bridge design, shared use path, and roadway conversion.
SOLICITATION NOTICE ¿EXTENDING SOQ RESPONSE DATE FROM NOVEMBER 24, 2025, TO JANUARY 12, 2026 for RFQ-484-West King Road Connector ¿ Pedestrian Bridge (GDOT PI# 0021212) Preconstruction Engineering Design Services in Support of West King Road Connector-Pedestrian Bridge for the City of Hampton, Georgia at the City of Hampton, City Hall, 17 East Main Street South, Hampton, GA 30228 until 2:00 p.m. (EST) on Monday, January 12, 2026. Late responses will not be accepted. FIRMS THAT HAVE SUBMITTED A SOQ ON OR BEFORE NOVEMBER 24, 2025, ARE NOT REQUIRED TO RESUBMIT. Preconstruction Engineering Design Services in support of the City of Hampton West King Road Connector Pedestrian Bridge project (PI# 0021212). The project will connect West King Road across State Route 20 (SR 20) and include minimum 10 feet wide shared use path a pedestrian bridge, and conversion of a roadway segment to pedestrian-only use services, for the City Project identified. FT
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.