The City of Washougal seeks a qualified consultant for professional engineering design services for the 39th Street Sidewalk Project, funded by the Safe Routes to School Program. The project includes sidewalk construction, pedestrian safety improvements, and stormwater management design.
Notice is hereby given that the City of Washougal is soliciting qualification statements from consultants to select a design consultant for professional services on the 39TH Street Sidewalk Project.
The City of Washougal was awarded grant funding through the Washington State Department of Transportation’s Safe Routes to School Program for the 39th Street Sidewalk Project. This project will improve pedestrian safety and connectivity along a key corridor linking Evergreen Way to J Street, serving students traveling to Gause Elementary School, Washougal High School, and Excelsior High School.
The 39th Street corridor currently experiences high vehicle speeds and lacks continuous pedestrian facilities, creating safety concerns for residents and students walking or biking to nearby schools. The project will address these issues by constructing approximately 2,200 linear feet of new sidewalk, upgrading ADA curb ramps, installing high-visibility crosswalks, Rectangular Rapid Flashing Beacons (RRFBs), speed feedback signs, and speed cushions, as well as adding pedestrian-scale lighting and buffered bike lanes.
This project supports the goals of the City’s Transportation Capital Facilities Plan (adopted April 2021) and Washougal Safety Plan (adopted February 2022) by improving non-motorized access, reducing vehicle speeds, and enhancing multimodal safety and connectivity.
The City is seeking a qualified consultant to provide engineering design services for this federally funded Safe Routes to School project, including environmental documentation, public outreach, right-of-way coordination, and preparation of bid-ready plans, specifications, and cost estimates.
In addition to the Safe Routes to School improvements, the City intends to evaluate and address drainage issues along 39th Street identified in the City’s Stormwater Master Plan. Runoff from a nearly 30-acre drainage basin currently collects along the 39th Street gutter lines and converges at the intersection with Evergreen Way, where frequent flooding occurs due to limited collection and conveyance capacity. The existing 18-inch storm system is estimated to be operating at approximately 75% capacity during a 100-year storm event, and the City lacks easement access to maintain the outfall. As part of this design effort, the selected consultant will also analyze stormwater conveyance and potential infiltration improvements along the corridor. This drainage analysis and related design work will be funded separately through the City’s stormwater utility.
Please refer to Exhibit A which details a proposed schematic of the project.
Responses to this RFQ must be complete. Responses that do not include the qualification statement content requirements identified within this RFQ and subsequent addenda, will be rated a Fail in the Evaluation Criteria and will receive no further consideration. Responses that are rated a Fail and are not considered may be picked up at the delivery location within 14 calendar days of contract award and/or the completion of the competitive process.
Past performance with the City of Washougal or other local agencies, if applicable.
This project does include a voluntary 5% SBE plan.
Please confirm that you have read and understood all aspects of this Request for Proposal.
The City of Washougal reserves the right to reject any and all Proposals and to waive irregularities and informalities in the submittal and evaluation process. This solicitation for Consultant Services does not obligate the City of Washougal to pay any costs incurred by respondents in the preparation and submission of a Proposal. This solicitation does not obligate the City of Washougal to accept or contract for any expressed or implied services. Furthermore, the City of Washougal reserves the right to award the contract to the next most qualified Consultant if the selected Consultant does not execute a contract within thirty (30) days after the award of the proposal.
Please enter a brief description of the Project using one or two paragraphs.
Upon selection of an alternative for implementation, the Consultant will
prepare plans, specifications, cost estimates, surveys, geotechnical investigations and assist the City in …
Will Consultants be required to provide pricing on a pricing table.
Will you be providing any attachments with this solicitation?
Example: Drawings, Specifications, Manuals, etc?
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.