Active SLED Opportunity · FLORIDA · GAINESVILLE REGIONAL UTILITIES
AI Summary
GRU seeks bids for installing 600 linear feet of commercial-grade black vinyl-coated chain link fencing and a 14-foot double gate at Serenola Substation to enhance security and aesthetics. The project emphasizes material quality, vendor experience, and compliance with safety standards. Key dates include a pre-proposal meeting on July 27, 2026, and a proposal due date of August 10, 2026.
GRU is soliciting bids for the installation of approximately 600 linear feet of commercial-grade, black vinyl-coated chain link fencing along the north property line of the Serenola substation. This project includes the installation of a 14-foot wide double gate system at the north corner of the property, located within the utility right-of-way, where it will function alongside an existing vehicle gate and connect to the current fencing behind the adjacent apartment complex. The primary goal is to significantly enhance site security while maintaining an aesthetically pleasing appearance that complements the neighboring hotel property. By selecting a high-quality, black vinyl-coated system, we ensure the necessary durability for utility infrastructure while achieving a low-profile, professional look that minimizes the industrial impact of the site.
This security enhancement project at the Serenola substation is driven by the immediate need to secure critical utility infrastructure against persistent unauthorized access. Current site observations confirm frequent, repeated trespassing by unauthorized individuals, as well as the presence of transient activity, domestic animals, and hotel personnel within the substation’s established perimeter. These incidents represent a significant liability and physical security risk to both the utility and the involved parties. The installation of a high-security, professional-grade perimeter barrier is a mandatory measure to mitigate these security vulnerabilities, ensure the integrity of site operations, and maintain compliance with established corporate safety standards.
| Event | Date | Location |
|---|---|---|
| Evaluation Meeting (Public) | 2026-08-19T17:30:00.000Z | Microsoft Teams meeting Join: https://teams.microsoft.com/meet/216621320760973?p=ymPDvxDwAiBH30mMIZ Meeting ID: 216 621 320 760 973 Passcode: Tx9zf9fW ________________________________________ Need help? | System reference Dial in by phone +1 352-554-8008,,698038391# United States, Gainesville Find a local number Phone conference ID: 698 038 391# For organizers: Meeting options | Reset dial-in PIN |
This criterion evaluates the vendor’s pricing for transparency, competitiveness, and long-term sustainability. The grading should look beyond the initial installation quote to assess the "Total Cost of Ownership," including the quality of materials and the cost of future maintenance. A superior bid will provide a detailed line-item breakdown that justifies the cost through superior durability and includes a comprehensive warranty.
This project requires industrial-grade deterrents, not residential materials. Vendors should be evaluated on the quality of their 9-gauge chain link fabric, the structural integrity of the gate, The hardware must be robust enough to withstand attempted forced entry and environmental wear over a 10-year lifecycle.
Evaluate the vendor’s history with similar utility or government contracts. High marks should be given to vendors who can provide references from other utilities or critical infrastructure managers. This confirms they understand the unique procurement, insurance, and performance bond requirements typical of GRU and other municipal utility operations.
"I hereby propose to provide the goods/services requested in this Solicitation. I agree to hold pricing for at least 60 calendar days from the Solicitation due date. I agree that GRU’s terms and conditions herein take precedence over any conflicting terms and conditions submitted for GRU’s consideration, and agree to abide by all conditions of this Solicitation.
I certify that all information contained in this Response is truthful to the best of my knowledge and belief. I further certify that I am duly authorized to execute and submit this Response on behalf of the organization as its agent and that the organization is ready, willing and able to perform if awarded.
I further certify that this Response is made without prior understanding, agreement, connection, discussion, or collusion with any other person, company or corporation submitting an offer for the same product or service; and the undersigned executed this Respondent’s Certification with full knowledge and understanding of the matters therein contained."
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
"Preference may be given to a business that certifies that it has implemented a drug-free workplace program. Pursuant to Section 287.087, Florida Statutes, whenever two or more competitive solicitations that are equal with respect to price, quality, and service are received by the State or by any political subdivision for the procurement of commodities or contractual services, a response received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie responses will be followed if none of the tied providers has a drug free workplace program. In order to have a drug-free workplace program, a business shall:
As the person authorized to sign the statement, I certify that this firm complies fully with the above requirements."
Pursuant to section 787.06(14), Fla. Stat., when this contract is executed, renewed, or extended the Contractor and any subcontractors must provide the City with an affidavit, signed by an officer or a representative of the Contractor and any subcontractors under penalty of perjury, attesting that the Contractor and subcontractor does not use coercion of labor or services as those terms are defined in this section.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Recipients must maintain certifications or equivalent documentation for proof of compliance that those articles, materials, and supplies that are consumed in, incorporated into, affixed to, or otherwise used in the infrastructure project, not covered by a waiver or exemption, are produced in the United States. The certification or proof of compliance must be provided by the suppliers or manufacturers of the iron, steel, manufactured products and construction materials and flow up from all subawardees, contractors and vendors to the recipient. Recipients must keep these certifications with the award/project files and be able to produce them upon request from DOE, auditors or Office of Inspector General.
Provide the Unique Entity ID number and upload the Active Status Registration for your organization. SAM.gov/home
By checking "Yes", bidder understands the following:
If awarded, a Performance Bond and Payment Bond are required. Contractor shall provide such bonds, using the forms attached, for 100% of the price of the awarded contract as security for the full and complete performance of the Contract and for the payment of all persons performing labor, furnishing materials or furnishing equipment in connection with the Contract.
The surety or sureties shall be a company or companies satisfactory to GRU. In accordance with the Florida Statutes, a person entering into a contract with GRU for the construction of a public building or repairs to a public building or a public work is required, prior to commencing work, to execute and record in the public records of Alachua County, a payment and performance bond with a surety insurer authorized to do business in the state as surety.
Please upload Pricing Response/Table.
Experience Modification Rate (EMR) Documentation for the most recent three (3) full years provided on letterhead from current insurance provider.
Please download the below documents, complete, and upload.
List all subcontractors that will be used for the Work along with the tasks they will provide. If the subcontractor is a small and minority-owned business, women’s business enterprise, or labor surplus firm, check the boxes that apply. The selected prime Contractor will be asked to provide the actual subcontractor spend amount at a later date. Subcontractors are not permitted to work at GRU if listed on the State of Florida Suspended Vendor List or the Federal Suspensions and Debarments.
Please download the below documents, complete, and upload.
Any deviation from this Solicitation must be provided and explained in detail with the Response. Deviations must be explained on a separate page labeled “Clarifications and Exceptions” and included with the Response. Each clarification and exception must correspond to the specific referenced section in the Solicitation. Otherwise, the Response will be considered in strict compliance with the Solicitation and the selected Respondent will be held accountable for compliance with the Specifications
Upload your Clarifications and/or Exceptions here.
Please download the below documents for your review.
Attach "not to exceed" lump sum pricing.
Attach information on quality of material.
Attach vendor performance and public utility experience.
Attach warranty information.
Attach completion time information.
Attach other proposal documents (optional)
Will the purchase of goods or services be funded by the State or Federal Government (i.e. Grants, FEMA Reimbursements).
Is this RFP going to be used for FEMA related funding?
Is this a GRIP Grant?
Is this a Construction Project?
Please select from the Terms of Award listed below if known:
1. Is this Solicitation for Goods only?
2. Is this Solicitation for a Service, Labor or Labor and Material?
3. Is this Solicitation for Consulting Services?
4. Is this Solicitation for Software Services?
Is the pre-bid meeting mandatory?
Enter number of minutes below:
"Representatives arriving to the Pre-Bid/Proposal Meeting more than __ minutes late will not be allowed to participate in the meeting."
Is the pre-bid meeting non-mandatory?
Enter number of minutes below:
"Representatives arriving to the Pre-Bid/Proposal Meeting more than __ minutes late will not be allowed to participate in the meeting."
Will there be a shortlist of bidders to be invited to present to the evaluation team?
Is this solicitation for engineering services, or for consulting services other than engineering services?
Is this solicitation for engineering, architectural or consulting services?
Does vendor need to provide EMR?
Would you like to have bidders respond to an electronic pricing table through OpenGov?
Some examples of when to say "yes":
List criteria being evaluated (i.e. price, delivery and warranty).
List 3-5 names of member who will be on the evaluation comittee.
Is a multi-year contract required?
Enter the begin date here (i.e. October 1, 2024)
Enter the termination date (i.e. September 30, 2024)
How many renewal will this contract have? (i.e. 'Three (3)'; 'Two (2)'; 'Three (3) One Year', etc.)
Will this solicitation require a bid bond?
Will a Performance Bond be required for this solicitation?
Is a Surety Bond required with bid submittals?
Enter the dollar amount of the surety bond
Is a Commercial Blanket Bond required with bid submittal?
Is a Fidelity Bond required?
Will Liquidated damages be required?
Enter dollar amount of Liquidated Damages.
For example: "Liquidated damages shall be assessed in the amount of $[XXX,XXX]. [Define when liquidated damages will apply]."
In what capacity will vendor be doing business?
Do work hours apply to this solicitation?
Enter the days of the week and the hours of the day that work can be done. (i.e. Monday-Friday, 8am-5pm)
Do you have a required delivery date?
Provide required delivery date
Do you have a specific delivery location?
Enter full delivery address here.
Is there a specific location where work will be done?
Please provide address for the job site.
Does the Florida Trench Safety Act apply to this solicitation?
The State of Florida incorporates the Occupational Safety and Health Administration’s (OSHA) excavation safety standards, 29 C.F.R. 1926.650 Subpart P, as its standard (Sections 553.60-64, F.S.). The Contractor/Respondent shall list separately in their Proposal the cost of compliance with these standards on a lineal footage basis and the method of compliance. The bidder shall determine if special shoring requirements are needed. Special shoring shall be identified and priced on a square footage basis in the Proposal. The Successful Bidder is fully responsible for the design of the trench safety system and the compliance with the applicable standards for the project.
Will a best and final offer apply to this solicitiation?
Is the vendor a:
(Your answer will automatically populate throughout the contract document)
Is the vendor a:
(Your answer will automatically populate throughout the contract document)
Choose whether this is an "Agreement" (such as a PSA or Software) or a "Contract". The document will be consistent with this answer.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.