SLED Opportunity · CALIFORNIA · MEXICAN AMERICAN OPPORTUNITY FOUNDATION
AI Summary
RFQ for demolition, shade structure installation, and poured-in-place surfacing at Arvin Early Learning Center in California. Includes engineered drawings, site preparation, and compliance with safety standards.
Statement of Work {SOW) Project: Arvin Early LearningProject Address: 800 South A Street, Arvin, CA 93203Project OverviewThis Statement of Work outlines the scope of services for demolition, shade structure installation,and PIP (Poured-in-Place) surfacing at the Arvin Early Learning site. All work will be completed inaccordance with applicable codes, safety standards, and Standard Wage requirements.Scope of Work1. Demolition• Demolition and removal of the existing playground equipment and shade structure.• Removal of existing PIP (Poured-in-Place) surfacing within the designated work area.• Proper disposal of all demolition debris in compliance with local regulations.2. Installation - Shade Structure• Installation of a new shade structure in accordance with approved plans and specifications.• All installation work to be performed based on Standard Wage requirements.• Coordination of labor, equipment, and materials necessary to complete installation.3. Shade Structure Specifications• Type: 4-Post Hip Shade• Dimensions: 12' x 20' x 12'• Footing Specifications:o Footing size: 18" diameter x 5' deep piero Reinforcement:• (6) #5 vertical reinforcing bars■ #3 reinforcing rings at 12" on center4. Engineered Drawings• Preparation and provision of engineered, stamped, and sealed drawings.• Structural calculations completed and certified by a licensed engineer.5. Freight• Delivery and freight of shade structure materials to the project site.6. PIP Subbase Preparation• Preparation of subbase for PIP surfacing using recycled sand.• Subbase preparation covering approximately 500 square feet.• Grading and compaction to ensure proper base conditions for surfacing installation.7. PIP Surfacing Installation• Supply and installation of 50/50 Poured-in-Place {PIP) surfacing.• Use of standard colors with black and aromatic binder.• Installation to meet applicable playground safety and performance standards.Exclusions• Any work not specifically identified in this scope is excluded unless authorized through awritten change order.Assumptions• Site access will be provided during normal working hours.• Client will secure any required site permissions and coordination.• Unforeseen site conditions may require a change order.8. General Conditions• Contractor shall comply with all applicable OSHA, state, and local safety regulations.• Contractor shall be responsible for obtaining any permits required to perform the work describedherein, including inspections if applicable.• Work shall be coordinated with site representatives to ensure safe access and minimaldisruption.• All work shall be completed in a professional and workmanlike manner. Estimated Bid Value: 100,000.00 Online Q&A: Yes Location Information: Department: Procurement Department Address: 401 N. Garfield Ave.Montebello, California90640 County: Los Angeles
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.