SLED Opportunity · CONNECTICUT · CITY OF BRISTOL
AI Summary
The City of Bristol, CT, invites bids for a sidewalk repair program including installation of sidewalks, curbing, concrete ramps, and related work on various streets through December 31, 2027. The contract requires labor, materials, and equipment with item-based pricing. Electronic bids due April 20, 2026.
The City of Bristol intends to obtain the services of a Contractor that will furnish all labor, supervision, tools, materials, and equipment necessary to install curbing, sidewalks, and other related work, complete in place, on various streets on an as-needed basis for the period through December 31, 2027, **Project Type**: ITB - Invitation to Bid **Source ID**: PU.AG.USA.2889749.C20667201 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/07/2026 04:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: City of Bristol **Reference Number**: 0000417914 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---| | Next Sidewalk Repair Program Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | 3 | 5” Concrete Ramp on New base | Each | 5 | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | 8 | 8” Concrete Ramp on New base | Each | 6 | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | 12 | Turf Establishment | Square Yard | 400 | 13 | Remove and Dispose of Tree Roots | Hour | 75 | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | A2 | Sidewalk Lifting | Day | 5 | | | | Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | 3 | 5” Concrete Ramp on New base | Each | 5 | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | 8 | 8” Concrete Ramp on New base | Each | 6 | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | 12 | Turf Establishment | Square Yard | 400 | 13 | Remove and Dispose of Tree Roots | Hour | 75 | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | | 3 | 5” Concrete Ramp on New base | Each | 5 | | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | | 8 | 8” Concrete Ramp on New base | Each | 6 | | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | | 12 | Turf Establishment | Square Yard | 400 | | 13 | Remove and Dispose of Tree Roots | Hour | 75 | | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | A2 | Sidewalk Lifting | Day | 5 | | | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | | A2 | Sidewalk Lifting | Day | 5 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---| | Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | 3 | 5” Concrete Ramp on New base | Each | 5 | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | 8 | 8” Concrete Ramp on New base | Each | 6 | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | 12 | Turf Establishment | Square Yard | 400 | 13 | Remove and Dispose of Tree Roots | Hour | 75 | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | | 3 | 5” Concrete Ramp on New base | Each | 5 | | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | | 8 | 8” Concrete Ramp on New base | Each | 6 | | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | | 12 | Turf Establishment | Square Yard | 400 | | 13 | Remove and Dispose of Tree Roots | Hour | 75 | | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | A2 | Sidewalk Lifting | Day | 5 | | | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | | A2 | Sidewalk Lifting | Day | 5 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | | 3 | 5” Concrete Ramp on New base | Each | 5 | | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | | 8 | 8” Concrete Ramp on New base | Each | 6 | | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | | 12 | Turf Establishment | Square Yard | 400 | | 13 | Remove and Dispose of Tree Roots | Hour | 75 | | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | | A2 | Sidewalk Lifting | Day | 5 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.