SLED Opportunity · CONNECTICUT · CITY OF BRISTOL

    Sidewalk Repair Program

    Issued by City of Bristol
    cityITBCity of BristolSol. 8590359913
    Closed
    STATUS
    Closed
    due Apr 20, 2026
    PUBLISHED
    Mar 30, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    The City of Bristol, CT, invites bids for a sidewalk repair program including installation of sidewalks, curbing, concrete ramps, and related work on various streets through December 31, 2027. The contract requires labor, materials, and equipment with item-based pricing. Electronic bids due April 20, 2026.

    Opportunity details

    Solicitation No.
    8590359913
    Type / RFx
    ITB
    Status
    Active
    Level
    city
    Published Date
    March 30, 2026
    Due Date
    April 20, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    City of Bristol
    Agency
    City of Bristol

    Description

    The City of Bristol intends to obtain the services of a Contractor that will furnish all labor, supervision, tools, materials, and equipment necessary to install curbing, sidewalks, and other related work, complete in place, on various streets on an as-needed basis for the period through December 31, 2027, **Project Type**: ITB - Invitation to Bid **Source ID**: PU.AG.USA.2889749.C20667201 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/07/2026 04:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: City of Bristol **Reference Number**: 0000417914 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---| | Next Sidewalk Repair Program Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | 3 | 5” Concrete Ramp on New base | Each | 5 | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | 8 | 8” Concrete Ramp on New base | Each | 6 | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | 12 | Turf Establishment | Square Yard | 400 | 13 | Remove and Dispose of Tree Roots | Hour | 75 | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | A2 | Sidewalk Lifting | Day | 5 | | | | Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | 3 | 5” Concrete Ramp on New base | Each | 5 | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | 8 | 8” Concrete Ramp on New base | Each | 6 | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | 12 | Turf Establishment | Square Yard | 400 | 13 | Remove and Dispose of Tree Roots | Hour | 75 | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | | 3 | 5” Concrete Ramp on New base | Each | 5 | | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | | 8 | 8” Concrete Ramp on New base | Each | 6 | | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | | 12 | Turf Establishment | Square Yard | 400 | | 13 | Remove and Dispose of Tree Roots | Hour | 75 | | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | A2 | Sidewalk Lifting | Day | 5 | | | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | | A2 | Sidewalk Lifting | Day | 5 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---| | Next Group 1-Base Bid Code Description UOM Qty 1 5” Sidewalk on Existing Base Square Foot/Feet 4000 2 5” Sidewalk on New Base Square Foot/Feet 500 3 5” Concrete Ramp on New base Each 5 4 6” Sidewalk on Existing Base Square Foot/Feet 350 5 6” Sidewalk on New Base Square Foot/Feet 400 6 8” Sidewalk on Existing Base Square Foot/Feet 1200 7 8” Sidewalk on New Base Square Foot/Feet 300 8 8” Concrete Ramp on New base Each 6 9 6” Bituminous Concrete Lip Curbing Linear Foot/Feet 150 10 3” Two Course Bit Concrete Apron Square Yard 250 11 2” Bituminous Concrete Driveway/ Sidewalk Square Yard 200 12 Turf Establishment Square Yard 400 13 Remove and Dispose of Tree Roots Hour 75 14 Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base Linear Foot/Feet 200 15 Install City-Supplied Granite Curbing on New Base Linear Foot/Feet 100 16 Supply and Install New Granite Curbing 6” x 18” on New Base Linear Foot/Feet 120 17 Allowance for Compaction and Sieve Analysis. Please enter $2,000 Lump-Sum 1 | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | 3 | 5” Concrete Ramp on New base | Each | 5 | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | 8 | 8” Concrete Ramp on New base | Each | 6 | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | 12 | Turf Establishment | Square Yard | 400 | 13 | Remove and Dispose of Tree Roots | Hour | 75 | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | | 3 | 5” Concrete Ramp on New base | Each | 5 | | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | | 8 | 8” Concrete Ramp on New base | Each | 6 | | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | | 12 | Turf Establishment | Square Yard | 400 | | 13 | Remove and Dispose of Tree Roots | Hour | 75 | | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | | Next Group 2-Alternate Bid Code Description UOM Qty A1 Sidewalk Lifting Square Foot/Feet 300 A2 Sidewalk Lifting Day 5 | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | A2 | Sidewalk Lifting | Day | 5 | | | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | | A2 | Sidewalk Lifting | Day | 5 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | 1 | 5” Sidewalk on Existing Base | Square Foot/Feet | 4000 | | 2 | 5” Sidewalk on New Base | Square Foot/Feet | 500 | | 3 | 5” Concrete Ramp on New base | Each | 5 | | 4 | 6” Sidewalk on Existing Base | Square Foot/Feet | 350 | | 5 | 6” Sidewalk on New Base | Square Foot/Feet | 400 | | 6 | 8” Sidewalk on Existing Base | Square Foot/Feet | 1200 | | 7 | 8” Sidewalk on New Base | Square Foot/Feet | 300 | | 8 | 8” Concrete Ramp on New base | Each | 6 | | 9 | 6” Bituminous Concrete Lip Curbing | Linear Foot/Feet | 150 | | 10 | 3” Two Course Bit Concrete Apron | Square Yard | 250 | | 11 | 2” Bituminous Concrete Driveway/ Sidewalk | Square Yard | 200 | | 12 | Turf Establishment | Square Yard | 400 | | 13 | Remove and Dispose of Tree Roots | Hour | 75 | | 14 | Cast-in-Place Monolithically Poured Concrete Curb on New 6” Base | Linear Foot/Feet | 200 | | 15 | Install City-Supplied Granite Curbing on New Base | Linear Foot/Feet | 100 | | 16 | Supply and Install New Granite Curbing 6” x 18” on New Base | Linear Foot/Feet | 120 | | 17 | Allowance for Compaction and Sieve Analysis. Please enter $2,000 | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | A1 | Sidewalk Lifting | Square Foot/Feet | 300 | | A2 | Sidewalk Lifting | Day | 5 |

    Key dates

    1. March 30, 2026Published
    2. April 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.