SLED Opportunity · MONTANA · SILVER BOW COUNTY

    Silver Bow Creek Greenway - Reach O/Cattle Bridge - Contract No. 30-22-01

    Issued by Silver Bow County
    countyRFPSilver Bow CountySol. 150
    Closed
    STATUS
    Closed
    due Feb 16, 2022
    PUBLISHED
    Jan 10, 2022
    Posting date
    JURISDICTION
    Silver Bow
    county
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    Silver Bow County seeks construction services for the Silver Bow Creek Greenway project including trail, bridge, fence, pipeline, and road construction with completion in 2022.

    Opportunity details

    Solicitation No.
    150
    Type / RFx
    RFP
    Status
    Closed
    Level
    county
    Published Date
    January 10, 2022
    Due Date
    February 16, 2022
    NAICS Code
    237310AI guide
    Jurisdiction
    Silver Bow County
    State
    Montana
    Agency
    Silver Bow County

    Description

    The Work will consist of, but is not necessarily limited to, providing all labor, materials, earthwork, and incidentals necessary to complete the Work as shown on the Drawings and described in the Special Provisions and Technical Specifications. The Work at Site 1 consists of constructing approximately 1.2 miles of asphalt surfaced trail from the north end of Durant Canyon to Fairmont Road, constructing the Gregson Station trailhead, amenities, and access road, and installing trail and road signage. The Work also includes repairing, replacing, or installing approximately 2.7 miles of barb wire fence, installing 6 barb wire gates and 1 cattle guard, enhancing the Fairmont/Milwaukee Road approach, installing approximately 265 feet of buried stock water pipeline and 1 stock tank including valves and fittings, and other works as shown on the Drawings and described in the Special Provisions and Technical Specifications. The Work at Site 2 consists of installing one 46-foot long prefabricated steel bridge across Silver Bow Creek, driving bridge helical piers, constructing reinforced concrete bridge caps, constructing approximately 1,250 linear feet of gravel access road, installing approximately 1,975 linear feet of smooth wire fence, constructing and reclaiming temporary access roads, installing culverts, and other works as shown on the Drawings and described in the Special Provisions and Technical Specifications. Construction will be completed in 2022 with no winter shutdown period. The Project includes all incidental work necessary to complete the Work as shown on the Drawings and described in the Special Provisions and Technical Specifications.

    Key dates

    1. January 10, 2022Published
    2. February 16, 2022Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.