SLED Opportunity · MINNESOTA · METROPOLITAN AIRPORTS COMMISSION
AI Summary
Metropolitan Airports Commission seeks contractors for 2026 EMC chilled water system upgrades including valve replacements, pump installations, controls and electrical work, concrete and structural steel reinforcement.
This project is upgrading the chilled water system by replacing chilled water control valves with a pressure-independent model, installing a magnetic filter, installing multiple pressure sensors, and replacing tertiary chilled water pumps. It is also installing an owner-furnished condenser water pump at the EMC. Controls work includes network controller upgrades, pressure sensor monitoring on the BAS, and control valve upgrades. Electrical work includes motor starter modifications and powering mechanical equipment. Work also includes the removal and replacement of concrete pads and structural steel work to reinforce a steel beam.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.