Active SLED Opportunity · CALIFORNIA · SACSEWER — COLLECTION SYSTEM
AI Summary
Roof replacement project for South Area Corporation Yard Administration Building involving installation of a Modified KEE Hybrid Roof System over 75,000 sq ft, replacement of 121 skylights, and all penetration seals. Completion by October 31, 2026. Requires Class C-39 Roofing Contractor license.
Project Description: The work to be performed under this contract includes furnishing of all labor, materials, tools, and equipment for the South Area Corporation Yard Administration Building Roof Replacement project. The work consists of replacing the existing PVC single-ply membrane with a Modified KEE Hybrid Roof System on approximately 75,000 square feet of roof. The work also includes replacing 121 skylights and replacing all penetration seals. Such other items or details not mentioned above that are required by these specifications or are required to complete the work shall be performed, placed, constructed, installed, or rehabilitated in accordance with the latest versions of the Sacramento Area Sewer District (SacSewer) Standards and Specifications, the County of Sacramento Standard Construction Specifications, the project specific Contract Documents (project specific specifications and plans), and/or as directed by the Resident Engineer. The successful bidder is to complete the project by October 31, 2026. Engineer’s Estimate: $3,400,000 License Required: Class C-39 – Roofing Contractor
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.