SLED Opportunity · CALIFORNIA · SOUTH PLACER MUNICIPAL UTILITY DISTRICT
AI Summary
SPMUD seeks a contractor to apply chemical root treatment to 242 mainline pipe segments totaling 65,839 feet. The contractor will provide labor, equipment, materials, and traffic control. Pre-treatment root cutting will be done by SPMUD.
The project scope of work includes the following: Apply Chemical Root Treatment to 242 Mainline Pipe Segments. Diameters ranging from 6-inch to 18-inch and accumulative length totaling 65,839 feet. The Contractor shall furnish all labor, equipment, materials, plant, and supervision to perform the work. SPMUD will perform pre-treatment root cutting at least 6 weeks prior to application of the product. Contractor shall provide traffic control measures, as required by encroachment permit issued by the governing agency.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.