    Invitation to Negotiate for expansion of Studios Energy South Chiller Plant in Lake Buena Vista, FL, including installation of chillers, pumps, cooling tower systems, electrical and fire protection systems, piping, site modifications, and infrastructure improvements.

    Opportunity details

    Solicitation No.
    ITN-16096
    Type / RFx
    RFP
    Status
    OPEN
    Level
    state
    Published Date
    May 27, 2026
    Due Date
    NAICS Code
    238220AI guide
    Jurisdiction
    florida
    State
    florida
    Agency
    Central Florida Tourism Oversight District

    Description

    This project includes the expansion of the Studios Energy South (SES) Chiller Plant, including the installation of new chillers, pumps, cooling tower systems, electrical and fire protection systems, associated piping and controls, site modifications, and related infrastructure improvements.

    The construction site is located at 397 Cypress Drive – Lake  Buena Vista, FL 32830.

    SCOPE OVERVIEW:
    A. Installation of new owner-furnished chiller and all associated piping, appurtenances, and controls;
    B. Installation of (2) new owner-furnished chilled water pumps and all associated piping, appurtenances, and controls;
    C. Installation of new concrete cooling tower basin, separate concrete pump pit, and all cooling tower piping, appurtenances, and controls. Cooling tower shall be field-erected by cooling tower manufacturer (TEI). Contractor shall be responsible for coordinating the installation of cooling tower with TEI. A 24" diameter underground equalizer pipe shall connect the new basin with the existing basin; new pipe shall connect to pipe installed in a previous project;
    D. Installation of (2) new owner-furnished condenser water pumps and all associated piping, appurtenances, and controls;
    E. All electrical systems supporting the above items #1-4 as well as lighting at new cooling tower and pump area and lightning protection at new cooling tower and pump area;
    F. New make-up water and overflow drain systems at new cooling tower;
    G. New fire protection system for new cooling tower. Fire protection system shall be a separate, alarmed branch from the existing dry valve system;
    H. Removal and relocation of existing yard drain where new cooling tower basin is to be installed;
    I. Removal of existing sidewalks along the east and south perimeter of the cooling tower yard and relocation of the fenceline;
    J. Waterproofing of new cooling tower basin

    Key dates

    1. May 27, 2026Published

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.