SLED Opportunity · CALIFORNIA · CALIFORNIA
AI Summary
Union Sanitary District seeks bids for electrical power modification and replacement at the Alvardo Wastewater Treatment Plant, including switchboard and motor control center replacements, underground duct bank construction, and related electrical work. Project duration is 300 days with an estimate of $1.72M.
Notice is hereby given that sealed bids will be received by the Union Sanitary District in their office located at 5072 Benson Road, Union City, CA 94587-2508, at any time prior to 2:00:00 p.m. local time on January 15th, 2026, for furnishing all labor, materials, equipment, and services for the construction of improvements designated as: Switchboard No. 3 and Motor Control Center No. 25 Replacement Project No.800-564. The Project consists of electrical power modification and replacement at the Alvardo Wastewater Treatment Plant (Plant). To accomplish the above, Contractor shall complete the following items indicated on the Drawings and Specifications, including but not limited to the following: Replacement of existing 480V Switchboard No. 3 (SWBD-3) located in the Main Electrical Building (Building No. 78). This work shall include the de-energization of equipment, disconnection of all wiring and network cabling, off-haul and disposal of the existing SWBD-3, modifications to the existing electrical busway duct, assembly and installation of temporary electrical panelboards and cables, installation of the new SWBD-3, re-termination of all wiring and network cabling, re-energization of new SWBD-3 and electrical testing. SWBD-3 and equipment listed in section 01010-4.0 will be furnished by the District. Replacement of existing 480V Motor Control Center No. 25 (MCC-25) located in the Main Electrical Building. This work shall include the de-energization of equipment, disconnection of all wiring, off-haul and disposal of the existing MCC-25, installation of temporary electrical panelboards and cables, installation of temporary control panels, assembly and installation of the new MCC-25, re-termination of all wiring, reenergization of new MCC-25 and electrical testing. MCC-25 will be furnished by the District. Re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30) located in the Cogeneration Building (Building No. 90). This work shall include the construction of a new underground electrical duct bank, asphalt pavement restoration, installation of aboveground conduits, installation and termination of new wiring, and demolition of existing wiring. The successful bidder will have Three Hundred (300) calendar days to complete the Project from the Notice to Proceed. The Engineer’s Estimate for this Project is $1,720,000. Notice is hereby given that sealed bids will be received by the Union Sanitary District in their office located at 5072 Benson Road, Union City, CA 94587-2508, at any time prior to 2:00:00 p.m. local time on January 15th, 2026, for furnishing all labor, materials, equipment, and services for the construction of improvements designated as: Switchboard No. 3 and Motor Control Center No. 25 Replacement Project No.800-564. The Project consists of electrical power modification and replacement at the Alvardo Wastewater Treatment Plant (Plant). To accomplish the above, Contractor shall complete the following items indicated on the Drawings and Specifications, including but not limited to the following:
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.