SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.
Contract Category
10 state, local & education solicitations AI-tagged as Motor Control Center Replacement.
Howard County, Office of Procurement
AI Summary
Howard County seeks a construction firm to replace major mechanical equipment and MCC at the grit removal facility of the Little Patuxent Water Reclamation Plant. The project includes demolition, installation, electrical work, and HVAC improvements. Bids due May 20, 2026.
Howard County, Office of Procurement · Maryland
AI Summary
Harris County seeks professional architectural and/or engineering services for design, construction, and commissioning to replace the Motor Control Center (MCC) and related mechanical and electrical components for the Washburn Tunnel Safety Enhancements project.
Harris County · Texas
AI Summary
Opportunity for full replacement of Motor Control Center at Northfield Wastewater Treatment Facility including temporary power to maintain operations during construction. Mandatory pre-bid walk-through on March 26, 2026.
Massachusetts · Massachusetts
AI Summary
West Basin Municipal Water District seeks bids for the TRWRP 93 Motor Control Center Replacement project, an electrical infrastructure upgrade supporting water services in Los Angeles County.
West Basin Municipal Water District · California
Howard County, Office of Procurement
AI Summary
Howard County seeks a construction firm to replace the Primary Substation No. 3 at the Little Patuxent Water Reclamation Plant, including demolition, new substation installation, electrical and structural work. Bids require a 5% bid bond or certified check.
Howard County, Office of Procurement · Maryland
San Mateo County Community College District
AI Summary
Bid opportunity for electrical construction services to replace Motor Control Centers in three buildings at San Mateo County Community College District, California.
San Mateo County Community College District · California
AI Summary
Source sought for piping, pump installation, and MCC replacement at Otter River Water Treatment Plant in Virginia. Optional pre-bid conference on January 29, 2026.
virginia · virginia
AI Summary
Bammel Utility District seeks contractors for replacement of a 353,000 gallon steel ground storage tank, hydropneumatic tank replacement, static mixer installation, motor control center replacement, and pipe recoating at Water Plant No. 1 in Harris County, TX.
Bammel Utility District · Texas
AI Summary
Union Sanitary District seeks bids for electrical power modification and replacement at the Alvardo Wastewater Treatment Plant, including switchboard and motor control center replacements, underground duct bank construction, and related electrical work. Project duration is 300 days with an estimate of $1.72M.
California · California
AI Summary
Gloucester County seeks replacement of motor control center and panelboards at its 2 mgd surface water and reverse osmosis water treatment plants due to aging electrical equipment.
virginia · virginia
Common questions about finding and winning Motor Control Center Replacement government contracts.