    AI Summary

    Pierce County seeks electrical engineering and design services for the Three Sisters Permanent Power Project Phase 1, including NEPA compliance and coordination for a FEMA-funded shore power installation supporting emergency communications.

    Opportunity details

    Solicitation No.
    213740
    Type / RFx
    RFI
    Status
    open
    Level
    county
    Published Date
    December 24, 2025
    Due Date
    January 14, 2026
    NAICS Code
    541330AI guide
    Jurisdiction
    Pierce County
    Agency
    Pierce County

    Description

    Pierce County Communication's Systems Division (PC-CSD) requires professional electrical engineering and design services to develop project plans for shore power installation up to the Three Sisters Radio Site, a federally funded project. Phase 1 of the FEMA grant will require firm to complete the electrical design and planning (zoning/permitting) tasks. Design Firm will need to acquire electrical engineering design, planning, and design services as well as support other planning services such as historical, archaeological, environmental, and geological. Design Firm to determine all information needed to apply for new permanent electrical service per PSE standards and provide necessary information for Pierce County to apply for utility easements.

    NEPA Compliance and Coordination Requirements
    The Design Consultant shall incorporate all National Environmental Policy Act (NEPA) related constraints into the design process from the outset. Coordination shall be maintained with Pierce County, Washington Emergency Management Division (EMD), and FEMA environmental specialists to ensure regulatory compliance and to prevent delays in Phase II project approval. This project involves the undergrounding of approximately 15 miles of powerline infrastructure to support a critical emergency communication system and is subject to NEPA review under FEMA’s Hazard Mitigation Grant Program (HMGP) Phase I. Design activities shall comply with applicable FEMA regulations, including 44 CFR Part 9 (Floodplain Management), 44 CFR Part 10 (Environmental Considerations), and FEMA’s Environmental and Historic Preservation (EHP) Policy. The Design Consultant shall minimize impacts to sensitive environmental and cultural resources, including wetlands, endangered species, and historic sites. The Design Consultant shall provide all documentation necessary to support NEPA review, including site maps, environmental and cultural assessments, and applicable permits. As stated in the grant award, “Engineering design must be completed in accordance with all applicable FEMA rules and regulations, including environmental and historic preservation requirements. The NEPA review will be a critical component of Phase I and must be supported by the design documentation.”

    Key dates

    1. December 24, 2025Published
    2. January 14, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.