SLED Opportunity · CALIFORNIA · SFO CONSTRUCTION
AI Summary
Trade Package C31 for the Terminal 3 West Modernization Project at SFO involves site work, paving, and striping to support the new Courtyard 4 Connector building. The project includes demolition, asphalt pavement installation, and extensive terminal upgrades while maintaining operations.
Design-Builder Firm Name: Turner Construction Company
Project Overview:
Terminal 3 West Modernization
The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately 516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.
Courtyard 4 Connector (C4C)
The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W) Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport (SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects.
The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions.
Trade Package No.: C31
Trade Package Title: C4C Site Work, Paving and Striping
Description of the Trade Package Scope of Work:
This scope includes all demolition, paving, and striping required to support the C4C building program, including early enabling and permanent asphalt concrete pavement installation.
Trade Package Bid Due Date and Time: 04/16/2026
Main Trades of the Trade Package: Site Work
CMD LBE Participation Requirement: 25%
Design-Builder requirements or prequalification criteria: Please reach out to Kelli Johnson at knjohnson@tcco.com for this trade package.
Contact for Trade Package information: Kelli Johnson email: knjohnson@tcco.com
Please contact the person whose information appears on the summary page of this opportunity.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.