SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
Massachusetts Chelmsford Water District seeks qualified contractors for furnishing and installing ductile iron and high-density polyethylene water and transmission mains, including valve vault modification. Bids due by March 11, 2026.
The project involves furnishing and installing approx. 3,700 feet of 8-inch ductile iron (DI) Water main, installing approximately 40 water services. Water service by-pass piping will also be required. The Work will also include furnishing and installing approx. 1,100 feet of 10-inch DI Transmission main and approximately 7,600 linear feet of 10-inch high-density polyethylene transmission main. The work also included the modification of the Davis Street Valve vault. The total time period for Pre Bid Conference: The Chelmsford Water District, acting through Lisa Quatrale, Business Director/Treasurer, will receive sealed Bids from qualified contractors for the Chelmsford Water District Transmission Main and Water Main Replacement
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.