SLED Opportunity · FLORIDA · MIAMI DADE STRATEGIC PROCUREMENT DEPARTMENT
AI Summary
Contract opportunity for structural repairs including concrete spall patching and epoxy crack injection on Tropical Park Stable A-E buildings in Miami-Dade, Florida. Work involves phased repair, material approvals, and engineered shoring as needed.
CONTRACTOR shall furnish all necessary supervision, labor, tools, materials, and safety equipment required to provide a complete installation of the Tropical Park Stable A-E – Building Repairs in accordance with the following. The work consists of performing structural repairs to the existing Stable A- E buildings at Tropical Park, including concrete spall patching and epoxy crack repairs on the precast double T roof framing system and adjacent structural elements. Repairs involve removing deteriorated concrete, evaluating and cleaning exposed reinforcing steel, installing replacement reinforcement where necessary, applying approved bonding agents, and placing structural repair mortar to restore original profiles. Cracks will be routed, sealed, port installed, and injected with low viscosity epoxy in accordance with manufacturer requirements. All repairs must be performed in accordance with the structural notes, material specifications, and repair details in the construction documents and coordinated with the Owner and Engineer throughout the process. This project involves rehabilitating deteriorated portions of the Stable A-E concrete roof system and related structural components to restore their integrity and performance. Contractor shall submit all proposed repair materials—including patching compounds, structural mortars, bonding agents, corrosion inhibitors, epoxy injection systems, and reinforcement—to the Engineer of Record for review and approval prior to use. The Contractor shall prepare and submit an initial mock up of the proposed repair procedures, based on approved product submittals, demonstrating all steps of concrete spall repair and epoxy crack injection—including surface preparation, reinforcement cleaning, bonding agent application, patch placement, and port injection methods—for review by the Owner, Engineer, and Special Inspector prior to proceeding with full production work. Contractor shall provide, install, maintain, and remove all necessary shoring and temporary bracing to ensure structural stability during repair operations. When required, engineered shoring drawings must be pre-pared and certified by a licensed professional engineer. The Contractor shall phase the work so that repairs are completed one stable at a time, with each stable fully repaired and accepted before work begins on the next, and progression shall occur only after final approval of the completed work by the Owner, the Special Inspector, and the Building Department. Work will be as per plans and specifications provided by Owner: • Attachment A: Stable A Building Repair Plans • Attachment B: Stable B Building Repair Plans • Attachment C: Stable C Building Repair Plans • Attachment D: Stable D Building Repair Plans • Attachment E: Stable E Building Repair Plans The Contractor acknowledges and agrees that this scope of work includes the includes performing all structural repairs to the existing Stable A–E buildings at Tropical Park, including concrete spall patching and epoxy crack injection on the precast double T roof framing system and adjacent structural components.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.