SLED Opportunity · MASSACHUSETTS · MASSACHUSETTS
AI Summary
Massachusetts state project for Winter Street improvements including drainage system replacement, full depth roadway reconstruction, and road realignment. Optional pre-bid site visit on March 18, 2026.
The work consists of the removal and abandonment of deteriorating corrugated metal drainage pipe. The construction of a new drainage system consisting of reinforced concrete pipe, precast manholes & catch basins, a headwall, and precast drywells within a major Town roadway. Existing catchbasins will also be removed and disposed of and drain manholes will be abandoned in place. This project also includes full depth roadway reconstruction and re-alignment of Winter St Pre Bid Conference: An optional Pre Bid Site Visit Meeting will be held at the intersection of Winter Street and Conant Street in Bridgewater, MA on March 18, 2026, at 11:00 AM.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.