Active SLED Opportunity · WISCONSIN · STRAND ASSOCIATES
AI Summary
Construction project for Yahara River Improvements Phase 1 in Stoughton, WI, including contaminated soil remediation, infrastructure modification, stormwater lift stations, and site improvements. Mandatory pre-bid meeting on June 25, 2026. Bids due July 2, 2026.
The Project includes the furnishing of all labor, materials, equipment, and incidentals necessary for construction of a river park and associated improvements. The Work generally includes contaminated material remediation; modification and abandonment of existing millrace, powerhouse, and culvert infrastructure; in-stream improvements; upland improvements; two stormwater lift stations; and installation of lighting and site improvements. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder’s maximum Bid price. Contract award shall be made based on the lowest responsive and responsible Bidder. Prospective Bidders are required to complete and submit a prequalification questionnaire with supporting documents to OWNER (see Instructions to Bidders). Prequalification forms will be provided with Bidding Document sets. Completed forms are to be submitted no later than 3 P.M., local time, on June 25, 2026. The Strand Associates, Inc.® project manager is Matthew D. Carerros, P.E. and can be contacted at 910 West Wingra Drive, Madison, WI 53715, (608) 251 4843; The Recreation Engineering and Planning (REP) project manager is Mason Lacy and can be contacted at 485 Arapahoe Avenue, Boulder, CO 80302, (303) 545-5883; and The True North Consultants, Inc. project manager is Mark Fryman and can be contacted at 525 Junction Road Suite 5800, Madison, WI 53717, (608) 234-5092. For further requirements regarding Bid submittal, qualifications, procedures, and Contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Category: Water Resources (River/Stream), Lift Stations/Lift Station Equipment, Culverts, Waterways, Stormwater Channels, Construction, Demolition/Building Removal/Hauling/Salvage, Remove Contaminated Soil, Drainage, Dredging, Ditches and Canals, Landscaping, Environmental Remediation, Erosion Control/Slope, Bank Stabilization, Grubbing & Clearing, Erosion Control - Temporary. Pre-Bid Meeting: A mandatory pre-bid conference will be held at 1 P.M. local time, on June 25, 2026, at Mandt Park Shelter, Stoughton, Wisconsin. Bidders are required to attend and participate in the conference. Bids submitted by Bidders who do not attend the pre-bid conference will be considered unresponsive and will not be opened. Bid Submission: Electronic Bids for the construction of the Project will be received by OWNER until July 2, 2026, at 1 P.M., local time. At that time the Bids received will be publicly downloaded and read aloud via teleconference. The login information for the teleconference is as follows: (309) 205-3325, Conference ID 948 8156 6074. Bid documents are available for purchase through QuestCDN. Contact us and we will obtain the full document package on your behalf.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.