SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.
Contract Category
4 state, local & education solicitations AI-tagged as Stress Absorbing Membrane.
AI Summary
The Town of Wolcott seeks qualified contractors for asphalt-rubber surface treatment stress absorbing membrane (SAM) on up to 10 miles of town roads, including labor, equipment, and materials, following Connecticut prevailing wage laws.
Connecticut · Connecticut
AI Summary
The Town of Wolcott seeks qualified contractors for Asphalt-Rubber Surface Treatment Stress Absorbing Membrane (SAM) on up to 10 miles of town roads, including labor, equipment, and materials, complying with Connecticut prevailing wage laws.
Connecticut · Connecticut
AI Summary
State-level road maintenance contract in Massachusetts for Hot Mix Asphalt installation, milling, structure adjustment, granite curb, reclamation, and SAMI. Bids due May 13, 2026.
Massachusetts · Massachusetts
AI Summary
On-call citywide roadway and sidewalk reconstruction services in Melrose, MA including milling, overlay, pavement reclamation, curb and sidewalk installation, and ADA ramps.
Massachusetts · Massachusetts
Common questions about finding and winning Stress Absorbing Membrane government contracts.