Active Solicitation · DEPT OF DEFENSE
AI Summary
The Directorate of Public Works at the Engineer Research and Development Center requires concrete materials for dust reduction at Building 2026. Deliveries include three separate concrete loads totaling 181 yards, scheduled by Tony King, with all other materials delivered at once within 14 days of award.
The Directorate of Public Works at the Engineer Research and Development Center (ERDC) in Vicksburg, MS has a requirement for concrete materials at Building 2026 to help reduce dust. All materials, excluding the concrete, shall be delivered at one time within 14 Calendar Days of Award. The concrete shall be delivered in 3 separate (39 yd, 58 yd, 84 yd for a total of 181 yd) non-consecutive deliveries after being scheduled by Tony King (The three concrete deliveries are approximate in size, could be in any order, and there could be several days, up to 2 weeks, between deliveries to allow prep for the concrete).
CONCRETE MATERIALS is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.