Closed Solicitation · DEPT OF DEFENSE

    LAFOURCHE EAST AND WEST JETTY ROCK SUPPLY

    Sol. W912P825QA009Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)NEW ORLEANS, LA
    Closed
    STATUS
    Closed
    closed Sep 18, 2025
    POSTED
    Sep 17, 2025
    Publication date
    NAICS CODE
    212311
    Primary industry classification
    PSC CODE
    5610
    Product & service classification

    AI Summary

    The Department of Defense is seeking suppliers for jetty rock supply, specifically crushed stone delivered to a mooring site. The material will be measured by net ton and must meet specified technical requirements. Delivery methods include barge, with specific measurement protocols outlined. This opportunity is not under Simplified Acquisition Procedures.

    Contract details

    Solicitation No.
    W912P825QA009
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 17, 2025
    Response Deadline
    September 18, 2025
    NAICS Code
    212311AI guide
    PSC / Class Code
    5610
    Issuing Office
    W07V ENDIST N ORLEANS
    Primary Contact
    Leann Thornton
    State
    LA
    ZIP Code
    70118-3651
    AI Product/Service
    product

    Description

    Amendment 0002 Replace Section E with the following:Section E ? Inspection and AcceptanceE-1 MEASUREMENT. Material shall be measured by the Net Ton (2,000 lbs.) ?Jetty? or ?Bullnose? stone, meeting or exceeding the technical requirements in Section C of these specifications, satisfactorily delivered to the mooring site. Barge measurements shall be conducted using the measurement/displacement method and by providing barge computations as verification /backup data.E-1.1 Barge Delivery. If delivery is made by barge, then weight in tons shall be determined by on-deck measurement, i.e. by difference in barge displacement between empty and loaded conditions, as measured by changes in draft at the four corners of the barge and adjusted for any rake at the ends of the barge. Any water that has filled in the barge must be removed prior to taking the difference in barge displacement. The Contractor shall furnish, not less than 10 days prior to delivery, a barge displacement table for each barge to be used under this contract for delivery of crushed stone. The Contractor shall also furnish a drawing or sketch of each barge, dimensioned in sufficient detail to permit checking the tables. Each table shall have its accuracy certified by a person or firm, other than the Contractor, customarily performing this service, and whom the Contracting Officer has approved. All other Terms and Conditions remain unchanged.

    Key dates

    1. September 17, 2025Posted Date
    2. September 18, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    LAFOURCHE EAST AND WEST JETTY ROCK SUPPLY is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.