Closed Solicitation · DEPARTMENT OF ENERGY

    PIP-II HPRF WR1150 WAVEGUIDE DIRECTIONAL COUPLERS FOR LB/HB650

    DEPARTMENT OF ENERGY
    Sol. RFP_375414RLPSolicitationBatavia, IL
    Closed
    STATUS
    Closed
    closed Nov 7, 2025
    POSTED
    Oct 31, 2025
    Publication date
    NAICS CODE
    335999
    Primary industry classification
    PSC CODE
    5999
    Product & service classification

    AI Summary

    The Department of Energy is soliciting proposals for directional couplers designed to sustain small differential air pressure, ensuring safety around RF distribution lines. Proposals must meet specifications outlined in RFP 375414RLP and include completed documents: SARC and PUR466. Additional details regarding operational requirements and termination options are provided in the update.

    Contract details

    Solicitation No.
    RFP_375414RLP
    Notice Type
    Solicitation
    Posted Date
    October 31, 2025
    Response Deadline
    November 7, 2025
    NAICS Code
    335999AI guide
    PSC / Class Code
    5999
    Primary Contact
    Rhiannon Patterson
    State
    IL
    ZIP Code
    60510
    AI Product/Service
    product

    Description

    Please provide proposal that meets specifications in document RFP 375414RLP and provide completed documents: SARC and PUR466.

    10/31/2025 UPDATE: 

    Based on questions received, Fermilab would like to provide additional information regarding this RFP:

    Fermilab needs couplers to sustain small differential air pressure. This will ensure that there are acceptable levels of non-ionizing radiation around the RF distribution lines after constructed or modified.

    Fermilab expects the RF distribution to run fully reflected from the cavity. Cross talk between ports during operation must be limited for diagnostic purposes.

    Having one 18” long coupling port on each wall would be acceptable.

    Fermilab has found that the termination is the most delicate part of the directional coupler. Previous replacements have occurred in the past. Having an external termination makes repair process easier. An acceptable option would be an internal termination that could be replaced in house, in the event of failure.

    Key dates

    1. October 31, 2025Posted Date
    2. November 7, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    PIP-II HPRF WR1150 WAVEGUIDE DIRECTIONAL COUPLERS FOR LB/HB650 is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.