Active SLED Opportunity · CALIFORNIA · CITY OF TURLOCK, CA
AI Summary
The City of Turlock seeks construction management services for Phase 1 of its System Wide AMI and Water Meter Installation project, involving replacement and integration of approximately 4,293 water meters with an advanced metering infrastructure system. Proposals are due June 24, 2026.
The City of Turlock is requesting proposals from qualified firms to provide construction management services for City Project No. 25-057: System Wide AMI and Water Meter Installation – Phase 1. Proposals must be submitted before the deadline specified in the RFP. Qualified vendors should review the full RFP for submission requirements, scope of services, and evaluation criteria.
The City of Turlock currently utilizes an Automated Water Meter Reading (AMR) system with a fixed radio network to collect water consumption data. The City serves approximately 20,000 water service connections, ranging in size from 3/4 inch through 10 inches. The existing AMR system requires significant operational resources to maintain and is approaching obsolescence. The current City standards call for AMCO C-700 positive displacement meters with digital registers equipped with Itron single-read endpoints.
The existing meters are reaching their 20-year lifecycle. In response, the City issued a Request for Proposal in December 2025 to procure water meters compatible with an Advanced Metering Infrastructure (AMI) system and capable of integrating with the City’s existing billing platform, Tyler Technologies New World software. In January 2026, City Council authorized the selection of Badger Meter, Inc. for the purchase of the meters. The phase 1 meter changeout will be completed as part of the City Project No. 25-057, System Wide AMI and Water Meter Installation – Phase 1 (Project).
As part of the Project, the City will modernize its water metering infrastructure by implementing an AMI system to improve meter accuracy, enhance data collection capabilities, and increase overall water system efficiency. The City will procure the BEACON SaaS AMI software and cellular ORION endpoints from Badger Meter, Inc. for use with the City-furnished meters. The construction contractor will be responsible for installing the City-furnished meters and endpoints, programming the equipment, and coordinating the data collection and integration work necessary to deliver a fully operational AMI system compatible with Tyler Technologies New World.
The City entered into an agreement for design, bidding, and engineering services during construction with QK (“Design Engineer”) in February 2026. The project design specifications and details are finalized, and the construction project was advertised on May 30, 2026. Construction bids will be due on June 22, 2026. QK estimates a construction contract cost of $3,723,000. The construction contract will allow the Contractor 85 working days to achieve Substantial Completion and 100 working days to achieve Final Completion. The construction project bid documents are included in the attachments as Construction Documents: System Wide AMI and Water Meter Installation – Phase 1.
The Project includes the following:
• Approximately 4,293 water meters ranging in size from 3/4" to 1-1/2” to be replaced with City-furnished meters and endpoints across the City
• Replacement of meter boxes, lids, and valves, where replacement or installation is determined necessary due to items being damaged, undersized, missing, or otherwise unsuitable
• Programming and integration of water meters and endpoints into an AMI system compatible with New World by Tyler Technologies
• Completion of all appurtenant and incidental work necessary to deliver a fully operational system
Firms that qualify as a qualified local vendor will receive a 5% preference, up to $5,000, on all City procurement opportunities. The prime proposer must qualify under the QLV to receive preference; subcontractors will not be considered. To qualify for local vendor preference, the proposer must submit documentary proof that the vendor meets the criteria established in 2-7-09 (c)(5), Turlock Municipal Code.
City staff may, at their sole discretion, conduct interviews with the top ranking consultants to gain additional insight into the consultant’s qualifications, experience, project understanding, approach, and overall capability to perform the requested services. Any interviews conducted will be used to supplement and clarify the information provided in the written proposals. Interviews, if held, shall be attended by representatives of the City and the consultant’s team proposed for the project.
Upload a copy of your proposal here.
Upload a document with the following information here:
Upload a document with the following information here:
Provide a detailed description of the approach and methodology to be used to accomplish the Scope of Work of this RFP. The Methodology Section should include:
Upload a document with the following information here:
Provide a list and resumes of individual(s) who will be working on this project, their relevant experience, and indicate the functions that each will perform and anticipated hours of service of each individual.
Upload a document with the following information here:
Provide a list of at least three (3) municipal/public agency references for similar services provided by your firm. The City reserves the right to contact any of the organizations or individuals listed. Information provided should include:
Upload your separate fee proposal here.
Please enter the following information:
If not a local vendor, please enter N/A.
By entering your name and title below, I hereby certify and affirm that with respect to the procurement of Construction Management Services for System Wide AMI and Water Meter Installation - Phase 1 Project:
If any conflict of interest arises at any stage before or after the award of the contract, the respondent will notify the City in writing.
Please provide your City of Turlock business license number.
If you do not have a City of Turlock business license number at the time of submittal, please enter "Do not have at this time" in the box below.
Please enter your contractor license number here.
Please provide your Unique Entity Identifier. If you do not have one at time of submittal, please enter “Do not have at this time" in the box below.
The successful bidder will be required to enter into an Agreement with the City. Please be advised the following provisions of the City’s Agreement are non-negotiable:
Failure to agree to these terms may result in disqualification and commencement of negotiations with an alternate vendor.
If you agree with the terms of this sample agreement, please confirm by checking the box below.
What is the minimum number of references you would like to receive from vendors, for projects of similar services provided in the past?
Refer to the default answer for formatting
Enter the exceeding dollar amount for any equipment purchase that requires City approval.
Example: $1,000.00
Enter the exceeding dollar amount for any equipment purchase during the award period that requires City approval.
Example: $1,000.00
https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=202520260AB339
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.