Invitation to bid for Helen McCall Park Expansion Phase 1 in Walton County, FL. The project includes construction of athletic fields, parking, buildings, stormwater drainage, and related infrastructure. Requires FDOT prequalification and coordination with lighting and electric cooperatives. Bids due July 16, 2026.
The proposed project, hereinafter referred to as the “Project” consists of the construction of new athletic fields, parking lots, buildings, and stormwater drainage at Helen McCall Park.
Location: Santa Rosa Beach, Florida
Contract Time: The contract duration is FIVE HUNDRED FORTY (540) days to substantial completion with an additional THIRTY (30) days for punch list completion.
Helen McCall Park is one of Walton County's most active recreational facilities, serving hundreds of youth and adult athletes annually in the heart of Santa Rosa Beach. The existing park infrastructure has reached capacity, and the demand for organized athletic programming — particularly youth baseball — has significantly outpaced what the current fields and facilities can support.
This expansion represents the County's commitment to meeting that demand with a first-class facility. Phase 1 will deliver six new baseball and t-ball fields west of Moll Drive, along with a press box, concessions, restrooms, batting cages, expanded parking, and all supporting infrastructure. The project requires coordination with two separate entities — MUSCO Lighting (procured via State contract) and Choctawhatchee Electric Cooperative (CHELCO) — for field and parking area lighting respectively, which introduces scheduling dependencies that bidders must account for from day one.
The site presents real construction challenges: significant earthwork with approximately 27,866 CY of import borrow required, a live forcemain sanitary sewer installation with pump stations, stormwater management facility expansion, and a DEP water and sewer permit that is pending at time of bid. The successful contractor will need strong project management, early coordination with MUSCO and CHELCO during rough grading, and the ability to sequence work around an active park environment. This is a high-visibility public project — the community is watching, the schedule matters, and quality of delivery reflects directly on Walton County.
The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the Helen McCall Park Expansion Phase 1 in Santa Rosa Beach, Florida, in accordance with the Construction Plans prepared by Dewberry, dated January 2026, and the Technical Specifications dated December 2025, both of which are incorporated into this ITB as Attachments. All work shall be performed west of Moll Drive unless otherwise indicated in the Contract Documents. Phase 2 improvements (east of Moll Drive) are included in the Contract Documents for informational purposes only and are not part of this contract.
The term "Bidder" shall mean one who submits a bid directly to the County, as distinct from a sub-bidder, who submits a bid to a Bidder. The term "Responsible and Responsive Bidder" means a person or entity who has submitted a bid which conforms in all material respects to the requirements set forth in the Bidding Documents and has the capability, in all respects, to perform fully the contract requirements, and the tenacity, perseverance, experience, integrity, reliability, capacity, facilities, equipment, and credit which will assure good faith performance. The term “Successful Bidder” means the most Responsible and Responsive Bidder with the lowest bid who has been selected for award of the Contract. The term “Contract” shall mean the agreement between the Successful Bidder and the County resulting from this ITB. The term “Contract Documents” includes the Construction Contract, Construction Plans prepared by Dewberry , dated January 2026, and information provided in Scope of Work and Attachments sections. The term "Bidding Documents" includes the Invitation to Bid, Instruction to Bidders, Contract Documents and the Bid Form (including all addenda issued prior to receipt of bids). The term “Notice of Award” shall mean the form issued by the Purchasing Department awarding the Contract to the Successful Bidder. The term “Notice to Proceed” shall mean the letter issued by the Purchasing Department notifying Successful Bidder to commence work on the Project.
The Contractor shall perform all clearing and grubbing of approximately 15.6 acres, demolition and removal of existing improvements including storm sewer, field lighting, fencing, dugouts, buildings, utilities, and irrigation systems. The Contractor shall perform regular excavation (approximately 12,052 CY), import and place borrow material (approximately 27,866 CY), and complete all grading and embankment work necessary to achieve the design grades shown in the Construction Plans. The Contractor shall furnish and maintain all erosion and sediment controls throughout construction, including silt fence (approximately 4,574 LF) and inlet protection at all storm sewer structures. All survey, staking, and as-built survey of improvements shall be provided by the Contractor.
The Contractor shall construct new parking lots and drive aisles as shown in the Construction Plans, including stabilized subgrade, limerock base, light and heavy duty superpave asphalt pavement, modified Type F curb and gutter, concrete sidewalks, curb ramps with detectable warnings, concrete wheel stops, dumpster pad and enclosure, signage, and pavement striping. All work shall conform to FDOT standards and specifications where applicable.
To demonstrate qualifications to perform the Project, each Bidder shall submit with their bid detailed written evidence of experience completing projects of the nature and scope similar to the project described in this Invitation to Bid, documentation of current commitments, a copy of all applicable occupational and state contractor licenses, and such information as is required in the Vendor Submissions section. Each Bidder must also be prepared to submit within FIVE (5) business days of the County's request, written evidence, such as licenses, financial data, previous experience, present commitments, and other such data as may be requested by the County. Each bid must contain evidence of Bidder's qualification to do business in the State of Florida. Specifically, the Bidder shall have all licenses and permits required by federal, state, and local statutes, regulations, and ordinances.
BIDDERS MUST BE PREQUALIFIED BY THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT).
The contractor(s) performing the work on Project (whether the prime contractor or a subcontractor) must be FDOT prequalified in the following work classes if performing work in that specific work class:
| WORK CLASS NUMBER | WORK CLASS NAME |
| 7 | Drainage |
| 10 | Flexible Paving |
| 11 | Grading |
| 12 | Grassing, Seeding, Sodding |
| 40 | Sidewalk |
Proof of FDOT prequalification in the above work classes must be submitted with the bid.
The Contractor shall install a complete storm sewer collection and conveyance system including FDOT standard manholes, inlets, Nyloplast drain basins, mitered end sections, concrete headwall, control discharge structures, and ADS pipe ranging from 12 inches to 36 inches in diameter. The Contractor shall also complete modifications to Stormwater Management Facilities 1 and 2 (SWMF 1 & 2) as shown in the Construction Plans, including expansion of the existing retention areas and establishment of littoral shelf plantings.
A mandatory pre-bid conference will be held at 9:00 am on Tuesday, June 23, 2026 at Walton County Central Purchasing Office, 176 Montgomery Circle, DeFuniak Springs, FL 32433 OR Bidders may also attend the pre-bid meeting via teleconference by dialing 850-635-0655, EXT 261217.
Bidders attending in person must be present at the designated start time of the pre-bid conference and must remain until the conference is adjourned.
Bidders may also attend the mandatory pre-bid meeting via teleconference by dialing 850-635-0655, extension 261217.
Bidders attending via teleconference are strongly encouraged to join the teleconference at least 10 minutes before the designated start time. If unable to join the teleconference at the number above, please call 850-892-8176 and ask to be included in the Helen McCall Park Expansion Phase 1 pre-bid teleconference.
Attendance will be confirmed via roll call at no later than 5 minutes after the designated start time and any Bidder not present for the roll call will not be eligible to bid on the project. If joining via teleconference, please keep phones muted until the question and answer portion of the teleconference. All bidders must remain until the conference is adjourned. The County will not accept bids from bidders arriving after attendance is confirmed or departing prior to adjournment of the pre-bid teleconference.
The Contractor shall install all potable water and fire service infrastructure including tapping sleeves and valves, PVC water service lines, gate valves, backflow preventers, fire hydrant assemblies, and associated fittings. The Contractor shall install a forcemain sanitary sewer system with grinder pump station(s), gravity sewer, manholes, cleanouts, and grease trap serving Building A. Bidders are advised that the DEP permit for water and sewer improvements is pending at the time of advertisement. The County anticipates permit issuance prior to the Notice to Proceed; however, the Contractor shall be responsible for coordinating any permit conditions into their means and methods. The 2-inch water meter will be supplied by Regional Utilities and installed by the Contractor.
A non-mandatory pre-bid conference will be held at 9:00 am on Tuesday, June 23, 2026 at Walton County Central Purchasing Office, 176 Montgomery Circle, DeFuniak Springs, FL 32433 OR Bidders may also attend the pre-bid meeting via teleconference by dialing 850-635-0655, EXT 261217.
Bidders attending via teleconference are encouraged to join the teleconference at least 10 minutes before the designated start time. If unable to join the teleconference at the number above, please call 850-892-8176 and ask to be included in the Helen McCall Park Expansion Phase 1 pre-bid teleconference.
The Contractor shall construct six (6) new baseball and t-ball fields including installation of infield material, field underdrainage (see Bid Alternate No. 4), chain link fencing and gates, backstops with netting and kneewalls, foul poles, dugouts, and scoreboards. Building A (press box, concessions, and restrooms) and associated vertical platform lift shall be constructed per the Contract Documents. The Contractor shall install all site amenities indicated in the bid schedule. Items noted as "Owner to Provide and Install" — including team benches, bleachers, bike racks, shade structures, and park rules signs — are excluded from the Contractor's scope of supply but the Contractor shall coordinate installation sequencing with the County.
The Contractor shall install a complete irrigation system including general site irrigation, pump station with fixed intake, and electrical service for the booster pump. The Contractor shall complete all landscaping, sod for open and disturbed areas (Tifway 419 Bermuda for athletic fields), and littoral shelf establishment for SWMF 1A and 1B per the Construction Plans and Specifications.
DIRECTING QUESTIONS TO ANY OTHER COUNTY COMMISSIONER, COUNTY EMPLOYEE, PROJECT ENGINEER, OR ANY OTHER PERSON IS PROHIBITED AND WILL RESULT IN A BID BEING DISQUALIFIED. QUESTIONS MUST BE SUBMITTED ON THE COUNTY'S E-PROCUREMENT PORTAL AT https://procurement.opengov.com/portal/waltoncountyfl NO LATER THAN 12:00 PM (NOON) ON JULY 7, 2026. Interpretations or clarifications considered necessary by the County in response to such questions will be issued by Addenda on the County’s e-Procurement portal. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
Field lighting for Fields 1 through 6 will be procured and installed by a separate contractor through a State-sourced contract (MUSCO Lighting). Parking area lighting will be installed by Choctawhatchee Electric Cooperative (CHELCO). The Contractor is not responsible for supplying or installing field lighting fixtures or parking light structures; however, the Contractor shall be responsible for coordination as described in Memorandum No. 001 (Attachment F), which is incorporated herein by reference. Specifically, the Contractor shall: (1) coordinate the stakeout of field lighting pole locations and home plate for each field during rough grading; (2) install and commission the lighting control panels provided by the field lighting contractor as part of the electrical service for the project; (3) coordinate with CHELCO for conduit installation during rough grading, with the understanding that CHELCO requires approximately two months of lead time to schedule their work; and (4) coordinate with CHELCO for final installation of parking light structures. The Contractor shall account for these coordination requirements in their project schedule submitted after issuance of the Notice to Proceed.
The period between the beginning of the advertisement for the Invitation to Bid, and the contract award, or any resulting bid protest is resolved, or the solicitation is otherwise canceled is referred to as the blackout period. During the blackout period any communication regarding the aforementioned solicitations is prohibited between the Bidder (or its agents or representatives) and any other entity with the potential for a financial interest in the award (or their respective agents or representatives) regarding such competitive solicitation, and any County Commissioner or County employee, selection committee member, or other persons authorized to act on behalf of the County including the County’s architect, engineer, or their sub consultants, or anyone designated to provide a recommendation to award a particular contract, other than Purchasing Division staff. Each competitive solicitation shall provide notice of the blackout period.
Exceptions to the Blackout Period. The blackout period shall not apply to:
The Contractor shall complete all mechanical, electrical, and plumbing work associated with Building A and all site utilities as indicated in the Construction Plans and Specifications. All work shall be performed by appropriately licensed subcontractors.
The use of brand names is for the purpose of describing the standard of quality, performance, and characteristics desired and is not intended to limit or restrict competition. Equipment or materials determined by the County to be substantially equivalent to that equipment or materials specified by brand name will be considered for award.
The Contractor shall obtain and pay for all permits required for construction, including but not limited to MPDS and local building and planning fees. The Contractor shall maintain all required licenses throughout the duration of the project, including a General Contractor license and MOT certification. All work shall be performed in compliance with applicable federal, state, and local regulations.
Work shall be performed during daylight hours, Monday through Friday, unless otherwise approved in writing by the County. The Contractor shall coordinate all construction activities with the Walton County Parks and Recreation Department to minimize disruption to existing park operations adjacent to the project site.
Contractor shall substantially complete the Project within FIVE HUNDRED FORTY (540) calendar days of issuance of the Notice to Proceed. Final completion of the project shall be accomplished within THIRTY (30) calendar days from the date a punch list of the remaining items to be completed is issued by the County. Failure to achieve substantial completion within the designated time may result in the County imposing liquidated damages in the amount of THREE THOUSAND, EIGHT HUNDRED THIRTEEN AND 00/100THS DOLLARS ($3,813.00) per day. Failure to achieve final completion within the designated time may result in the imposition of liquidated damages of THREE THOUSAND, EIGHT HUNDRED THIRTEEN AND 00/100THS DOLLARS ($3,813.00) per calendar day and shall accrue until an application for final payment has been approved by the County. These liquidated damages represent a reasonable estimate of the County’s extra expenses and losses for denied use of the facility, financing costs, additional extended overhead, and any lost revenues and do not constitute a penalty or forfeiture.
This ITB includes four (4) bid alternates. The County reserves the right to award any, all, or none of the alternates based on available funding and project need. Alternate No. 1 includes construction of Building C (restroom) with associated sanitary sewer. Alternate No. 2 includes a 6-inch concrete slab for future batting cages. Alternate No. 3 includes Building B equipment storage shed. Alternate No. 4 includes complete field underdrainage for all athletic fields.
All bids submitted on e-Procurement Portal will be securely locked and digitally encrypted until the submission deadline passes. Please note that all bids must be submitted prior to 2:00 pm on Thursday, July 16, 2026.
In order to perform work on public contracts, the successful Bidder shall have all licenses and permits required by federal, state, and local statues, regulations and ordinances.
Ensure that all required documents and information are complete and accurately provided before submission.
Upon successful submission through the e-Procurement Portal, you will receive a confirmation email acknowledging receipt of your bid.
Bids received after the specified deadline will not be considered.
Thank you for your attention to these submission instructions. Should you have any questions regarding the bidding process or requirements, feel free to contact the Purchasing Department at purchasing@co.walton.fl.us or call 850.892.8176.
All bids shall remain open and subject to acceptance for a period of thirty (30) calendar days after the date of bid opening, but the County at its sole discretion may release any bid and return the bid security prior to that date.
If the contract is to be awarded, it will be awarded to the Responsible and Responsive Bidder submitting the lowest bid whose evaluation by the County indicates to the County that the award will be in the best interest of the Project. The Notice of Award shall be issued only after approval by the Walton County Board of County Commissioners and upon completion of all required award documentation.
No contractual obligation shall exist until the contract has been approved and executed by the Board.
Any person or entity whose bid is rejected, in whole or in part, or who submits a bid but is not awarded the contract, may protest such decision. Written notice of intent to file a bid protest must be submitted with the Purchasing Department or Chief Financial Officer within twenty-four (24) hours after the Board’s declaration of its intention with regard to an award. Written protest must be submitted to Purchasing Director or Chief Financial Officer within ten (10) calendar days after filing written notice of intent.
Each written protest must be accompanied by a bid protest bond in the form of a certified check, cashier’s check, or money order made payable to the Walton County Board of County Commissioners, in an amount equal to 1% of the protestor’s bid received by the County, but in no case less than $500.00.
The condition of the protest bond shall be that, should the protest be determined to be without merit and non-valid, the bond shall be forfeited to the County in its entirety.
A person or an affiliate who has been placed on the convicted vendor list following a conviction for public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, Florida Statutes, for CATEGORY TWO for a period of thirty-six (36) months from the date of being placed on the convicted vendors list.
I hereby certify under penalty of perjury that my business qualifies as a local vendor/contractor in accordance with Walton County Purchasing Policies and Procedures, Procedure No: PP017.
The undersigned, herein defined as the "Bidder," declares that the only persons or parties interested in this bid are those named herein, that this bid is, in all respects, fair and without fraud, that it is made without collusion with any employee or official of the County, and that the bid is made without any connection or collusion with any person submitting another bid on this Project.
The Bidder further declares that it has visited the Project site, inspected the plans and specifications, examined all the Contract Documents, and has satisfied itself to the quantities involved, including materials and equipment and the conditions of work involved, including the fact that the description of work and materials, as included herein, is brief and is intended only to indicate the general nature of the Project and to identify the said quantities with the detailed requirements of the Contract Documents, and this bid is made according to the provisions and under the terms of the Contract Documents which are made a part of this bid.
The Successful Bidder agrees to acknowledge the terms and conditions of the Contract and return a signed Contract with any Certificates of Insurance (COI) to the County, within TEN (10) business days after Notice of Award. Upon receipt of the signed Contract and COI, the County will execute the Contract and send the executed contract to the Successful Bidder to acquire the Performance and Payment Bond(s) within FIVE (5) business days. The Successful Bidder must provide certified copies of the recorded Performance and Payment Bond(s) prior to the issuance of the Notice to Proceed. Failure to either return a signed Contract with COI to the County within TEN (10) business days after Notice of Award is sent or provide certified copies of the recorded Performance and Payment Bond(s) within FIVE (5) business days after receipt of the executed contract will result in loss of surety.
The Successful Bidder further agrees to begin work on the Project within TEN (10) business days after the date of issuance of the Notice to Proceed, to substantially complete the Project within FIVE HUNDRED FORTY (540) calendar days of issuance of the date of the Notice to Proceed, and to finally complete the Project within THIRTY (30) calendar days from the date a punch list of remaining items is issued by the County. The Contractor shall comply with all specific completion dates and sequences indicated elsewhere in the Contract Documents.
The Bidder agrees that any and all applicable federal, state and local sales and use taxes that are incurred by the Bidder are included in the stated bid price for the Project. The County is tax exempt from federal excise and state sales tax.
Please download the below documents, complete, and upload.
By confirming, if awarded the contract, the Bidder agrees to accept as full payment for the work proposed under this Project, as specified in the Bidding Documents prepared by Walton County, and based upon their own estimate of the quantities and costs, including the cost of any necessary fee or permit provided as part of their bid.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Will you be utilizing Surety 2000 for submitting your Bid Bond?
Please enter your Bid Bond information from Surety2000 below.
If you would like to use your preferred surety, please select "No" to the above question.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
Please download the below documents, complete and have notarized. An online notarization option will be provided for you when responding.
Identical tie bids: preference shall be given to businesses with drug-free workplace programs. Whenever two or more bids which are equal with respect price, quality, and service are received by the state or by any political subdivision for the procurement of commodities or contractual services, a bid received from a business that certified that it has implemented a drug-free work place program shall be given preference in the award process. Established procedures for processing tie bids will be followed in none of the tied Consultants have a drug-free workplace program. In order to have a drug-free workplace program, a business shall:
As the person authorized to sign this statement, I certify that this firm complies fully with the above requirements.
Please enter your FEIN below.
Please download the below documents, complete, and upload.
Please upload proof of registration from Sunbiz.org.
For purposes of determining any possible conflict of interest, all Bidders must disclose if any Walton County employee(s), elected official(s), or if any of its agencies is also an owner, corporate officer, agency, employee, etc., of their business.
Please select "No" if this is a grant-funded, federally-funded or state-funded.
Who provided the construction plans?
Example: Walton County Public Works or Name of the Outside Engineering Firm (Atkins etc.)
Format: Month Date, Year
Example: January 12, 2024
Substantial completion in _____ calendar days after issuance of Notice to Proceed.
Format: NUMBER IN WORDS (#)
Example: ONE HUNDRED FIFTY (150)
Days after issuance of punch list for final completion.
Format: NUMBER IN WORDS (#)
Example: FIFTEEN (15)
Example: THREE HUNDRED AND 00/100THS DOLLARS ($300.00 )
Example: THREE HUNDRED AND 00/100THS DOLLARS ($300.00 )
How many days after issuance of NTP must the project start?
Format: NUMBER IN WORDS (#)
Example: TWENTY (20)
This project requires FDOT prequalification for certain work classes as identified in the solicitation.
If your firm or any subcontractor will perform work requiring FDOT prequalification, you must be properly prequalified in the applicable work classes and provide documentation with your bid.
This project requires FDOT prequalification for certain work classes as identified in the solicitation.
If your firm or any subcontractor will perform work requiring FDOT prequalification, you must be properly prequalified in the applicable work classes and provide documentation with your bid.
Please confirm your firm’s compliance with this requirement.