SLED Opportunity · ARIZONA · ARIZONA SCHOOL DISTRICTS
AI Summary
Holbrook Unified School District #3 in Arizona seeks bids for HVAC replacement at Holbrook High School Gym. The project includes strict compliance with safety, warranty, and procurement requirements. Bids are due April 22, 2026, with a pre-bid meeting on March 27, 2026.
Holbrook Unified School District, #3 is in Navajo County serving our K-12 Community. This solicitation, HVAC Replacement at Holbrook High School Gym, will be funded by the Division of School Facilities. The Roof Warranty is held by Jim Brown and Sons Roofing , (JBS).
Bring your subcontractors with you to this prebid. This will be the only opportunity to visit the site as it is an occupied campus. Do not ask to use the district's facilities while on campus.
| Event | Date | Location |
|---|---|---|
| Public Bid Opening of the electronic bids received will be held virtually immediately following the deadline. | 2026-04-22T18:00:00.000Z | Google Meet joining info Video call link: https://meet.google.com/qdn-uikv-drh Or dial: (US) +1 720-465-5618 PIN: 170 892 724# |
Prebid Sign In Sheet
This Addendum is issued to provide clarifications and supplemental information to the original solicitation, including responses to vendor questions submitted in accordance with the Uniform Instructions to Offerors.
All changes, interpretations, and clarifications issued herein shall be considered part of the Solicitation and shall take precedence in accordance with the Order of Precedence provisions.
Bidders are responsible for reviewing this Addendum in its entirety and incorporating all applicable information into their Bid submission.
After being found both Responsive and Responsible, cost is the only factor.
By clicking yes, you agree to comply with School Social Distancing Procedures and follow the CDC guidelines https://www.cdc.gov/coronavirus/2019-ncov/community/guidance-business-response.html.
As COVID-19 impacts our schools, and contractors (subs included) engineers, and architects accessing our sites must be able to control and minimize the risk for students, staff, and visitors. Has your company implemented a response plan for anyone working on our sites and are they following the CDC guidelines related to COVID-19.
Are you practicing social distancing, conducting group meetings using Google Meeting or other video conference methods? Are you using disinfectant wipes and employing enhanced cleaning procedures at your work sites including Social distancing during lunch breaks and cleaning lunch and break areas after each use by removing their trash daily?
Are you asking anyone who is sick to stay home and away from the work site, are you requiring employees to wear PPE (Hardhat, Safety Glasses, Gloves, High Visible Vest)? Are you cleaning tools and other equipment with disinfectant wipes that claim "kills greater than 99% of bacteria".
Our firm understands that we are not to embed any documents within the questionnaire, as they will not be accessible or evaluated. Embedded Links will disqualify your response.
When a document is required to be uploaded, it must be in pdf format and unlocked (unless the firm will provide the key if they are the highest ranked firm.)
Our firm understands that we are not to embed any documents within our uploaded files, as they will not be accessible or evaluated.
Please download the below documents, complete, and upload.
Does your firm commit to sending the Schedule of Values to BESP and Holbrook Unified School District, #3 within 48 hours of the bid opening?
The resulting contract is subject to all terms of the district procurement code including limitations as to duration, rights of the district to terminate and means of dispute resolution. No resulting contract is renewable except to the extent provided in the solicitation. No vendor terms take precedence over the solicitation and district procurement code.
Will all your employees and subcontractors have Fingerprint Clearance Cards/
Has your firm communicated pricing, strategies, or other deceptive communication to that could lead to a sham bid submittal?
Please provide a e-mail address (preferably a generic company e-mail address) where POs will be submitted for processing.
Please upload a scanned copy of your Bid Bond here. If you are the low bidder your hard copy bond must be in the hands of the district within 48 hours and dated on or before the bids were due.
The purpose of this question is to confirm the Bidder’s acknowledgement and acceptance of the following:
All exceptions or modifications to the Solicitation, regardless of whether the District approved such items prior to submission of the Offer, must be clearly set forth in this form.
Any deviation or exception to information found within the solicitation must be identified below. Any deviation, exception or the inability of the vendor to comply with a particular item found within the IFB must be clearly and fully stated. Failure to list any deviations indicates full compliance with the solicitation.
Please download the below documents, complete, and upload.
Explanatory Note: The purpose of this form is to request that Holbrook Unified School District, #3 treat as confidential specific information in the Offer that the Offeror or Bidder believes is a trade secret or other proprietary information. All information that is the subject of the request for confidentiality must be designated on the page or pages of the Offer in which it appears. An explanatory statement for the request must be clearly set forth in this form. Additional pages may be attached to the form. The District Representative shall review the statement and provide the determination in writing whether the information shall be protected. If the District Representative determines that the information shall be protected from disclosure, the District Representative shall inform the Bidder or Offeror in writing of such determination. Requests to protect pricing information or the entire Offer from disclosure will be denied.
Please download the below documents, complete, and upload.
Contractor to confirm that DSF does not allow for change orders. Anything that is unclear must be addressed in the procurement phase of bidding.
The cost of materials could increase from bid date to PO date and would be discussed at the Preconstruction Meeting. Labor will not increase.
Please confirm.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Upload your Contractor's Warranty for two years after substantial completion.
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. This should be in days.
Name the major material and/or equipment and the current lead-time.
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Please upload any certifications here.
Upload your Contractor's Warranty for two years after substantial completion.
Please upload your Manufacturer's Intent to Warranty(s) for Weatherization Products
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. Per plans and specifications is not acceptable!
Name the major material and/or equipment and the current lead-time.
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Upload your Contractor's Warranty for two years after substantial completion.
Please upload your Manufacturer's Intent to Warranty(s) for the Roofing Project.
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. Per plans and specifications is not acceptable!
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project.
Name the major material and/or equipment and the current lead-time.
Upload your Contractor's Warranty for two years after substantial completion.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. Per plans and specifications is not acceptable!
Name the major material and/or equipment and the current lead-time.
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project. This should be a Gantt style response.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Please download the below documents, complete, and upload.
ATTENTION: Architects, Engineers, Consultants, Contractors, Sub- contractors, Craftsmen and Vendors. The following information is extremely important and must be adhered to without exception:
Asbestos Contained Building Materials (ACBM) will not be used on any project within the Holbrook Unified School District, #3. ACBM is defined as any building material having an asbestos content of 1% or more. Typical examples of materials that may contain asbestos and therefore would be considered ACBM are: vinyl asbestos tile, certain forms of adhesive used to hold vinyl tile, certain forms of adhesive used to hold cove base molding, some thermal insulation, and transite paneling. The above list is not complete but merely represents some of the material more commonly found on job sites that are ACBM. As per EPA guidelines, some roofing material used on the exterior of the buildings may be considered ACBM.
Solder and paint with any amount of lead is no longer authorized, and will not be used in any District projects.
HOLD HARMLESS: Interface of work under this contract with work containing asbestos shall be executed by the contractor at risk and discretion with full knowledge of the currently accepted standards, hazards, risks and liabilities associated with asbestos work and asbestos containing products. By execution of this contract, the contractor acknowledges the above and agrees to hold harmless the owner, employees and agents and assigns for all asbestos liability which may be associated with respect to the above-mentioned standards, hazards, risks and liabilities.
I have read the above information and will comply.
What is your current bonding capacity?
Upload a copy of your AROC License.
From call to arrive, what is the response time or hour if it is the next day:
Call received at 6:00 AM from Name of a District
Call received at 4:00 pm from Name of a District
Call received at Noon from Name of a District
Please download the below documents, complete, and upload.
The completed form should be notarized and included in the bid package to attest that your firm and its employees are not related in any way to the District, its staff, nor that of the members of the Governing Board.
Please download the below documents, complete, and upload.
Please upload your offer and acceptance form here.
ALL UNSIGNED RESPONSES SHALL BE REJECTED.
Please download the below documents, complete, and upload.
Please enter your AZ ROC license(s) here.
This Drug-Free Workplace Certification is required pursuant to Government Code §8350, et seq., the Drug-Free Workplace Act of 1990. The Drug-Free Workplace Act of 1990 requires that every person or organization awarded a contract for the procurement of any property or services from any State agency must certify that it will provide a drug-free workplace by doing certain specified acts.
I acknowledge that I am aware of the provisions of Government Code §8350, et seq. and hereby certify that I will adhere to the requirements of the Drug-Free Workplace Act of 1990.
Please download the below documents, complete, and upload.
Please upload your notarized Non-Collusion Affidavit here
Please upload your complete W-9 here.
Please upload your complete COI here.
Please enter your SAM Unique ID Number here.
To the extent applicable, Holbrook Unified School District, #3 is prohibited by A.R.S. § 35-393.01 from entering into a contract with any company for professional services unless the contract with the company includes a written certification that the company is not currently engaged in, and will not, for the duration of the contract, engage in a boycott of Israel. By submitting a Response, a Respondent represents to HUSD that it is not currently engaged in a boycott of Israel and that it will agree to language in the contract prohibiting any such boycott for the duration of the contract
Pursuant to A.R.S. § 35-394, written certification is required to show that the company entering into a contract with a public entity does not use the forced labor, or any goods or services produced by the forced labor, of ethnic Uyghurs in the People's Republic of China.
Under A.R.S. § 35-394:
1. "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate, that engages in for-profit activity and that has ten or more full-time employees.
2. "Public entity" means this State, a political subdivision of this State or an agency, board, commission or department of this State or a political subdivision of this State.
In compliance with A.R.S. §§ 35-394 et seq., all offerors must select one of the following:
Upload your completed Federal Compliance Form found in the #Attachments
Confirm that the following know and understand the requirements of the requirements of Certified Payrolls.
Please type in the school district name here to auto populate throughout the solicitation
Protest Person, and title
What is the Business Manager's Name?
What is the Business Managers Phone #
What is the Business Managers Email Address
Please enter the School District Initial (SDI)
Please choose all that apply
Does the District have teacherage?
Will you accept partial Bids?
Please enter the design firm's name here.
Please enter the name of the design rep
How many days from NTP
How many days from NTP until Final Completion
Please enter the A/P Address invoices will need to be sent to
Example: 143 S. Alma School Road, Mesa, AZ 85201
Do you need an Electronic Pricing Table for this solicitation?
What is the name of the school
What is the address of the School?
Has it been done?
If yes this will need Certification and Visual Inspections
Is this on the Rez
Does this require a Bid bond?
Is this a Division of School Facilities Funded Project?
Please check all you will require in Special Terms and Conditions
Where are the funds coming from?
Yes or no
Well, treatment plant, sewer system, etc
Flooring, doors, windows, grading and drainage?
Q (Roof Warranty): Is the existing roof under a warranty? If so, what roofing contractor holds this warranty?
A: The existing roof remains under warranty, which is held by Soprema as the roofing manufacturer associated with the original installation completed approximately three to four years ago. For informational purposes only, the Soprema representative is Walt Hitchcock and may be reached at whitchcock@soprema.us or 480-694-3433. Walt Hitchcock can also provide a list of qualified roofing contractors authorized to perform warranty-compliant repairs.
Q (OSA Damper & Hood): The unit schedule says to provide 0-25% OSA damper and set to cfm shown, but ALSO says to provide factory economizer with barometric relief and CO2 sensor kit. Can you please confirm what is to be provided?
A: Per sheet M-4 Equipment Schedules, the new AC-1, AC-2, AC-3, AC-4, AC-PE1, AC-PE2, AC-PE3 and AC-PE4 shall be provided with Factory Manual Dampers. New AC-1G, AC-2G and AC-3G serving Gym shall be provided with Factory Economizers with CO-2 Sensors.
Q (Fire Alarm System): Who is the fire alarm system monitored by so the new smoke detectors can be tied in?
A: The School’s Fire Alarm Company is Hiller Companies and contact is Sean Gladden; (928) 440-5223; sgladden@hillercompanies.com
Q (Davis Bacon Wages): Are Davis Bacon Wages required for the project?
A: No.
Q (Asbestos Abatement): If asbestos abatement is necessary will the owner contract with an abatement company to perform the abatement?
A: No.
Q (Supply and Return Air Duct at AHU-1,2,3,4 Physical Education Building ): The plans show the supply and return duct for the existing AHU to be in the existing curb. The existing supply air is actually a separate penetration through the existing roof. Please indicate if new curbs will be required for these units.
A: Refer to attached sketch SK-01 for revised supply and return connections to existing ducts.
Q (Building Occupancy): Will the building be occupied during construction?
A: No.
Q (Temporary Cooling or Heating): Is temporary cooling or heating required during construction.
A: No.
Q (Building Permits): Will the project require building permits or electrical permits?
A: No.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.