Active SLED Opportunity · COLORADO · CITY OF LOVELAND
AI Summary
City of Loveland seeks bids for removal, installation, and relocation of automated gate systems at Police/Courts and Recycle Center, including related site and electrical work. Mandatory onsite visit on July 6, 2026. Bid due July 30, 2026.
The Work consists of removing and salvaging the existing north gate at the Police and Courts facility, installing a new automated two-panel gate system, and relocating the salvaged gate for installation at the Recycle Center. Work includes removal and replacement of gate equipment, card access devices, bollards, vehicle detection loops, safety devices, fencing modifications... **Project Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1245.C18755251 **Piggyback Contract**: No **Questions are submitted online**: Yes **Onsite Visit**: 07/20/2026 12:00 PM EDT **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: Bids will only be accepted if placed by the date and time set forth above. **Owner Organization**: City of Loveland **Reference Number**: 0000428417 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | Yes | No | **Pre-Bidding Events**: Event: Onsite Visit | Date: 07/20/2026 12:00 PM EDT | Location: Police and Courts Building- Lobby, 810 East 10th Street, Loveland, Colorado | Mandatory: True **Questions and Answers**: | Question | Answer | |---|---| | I do not see where is states the gate Manufacturer( Tilt A Way) or the gate model (HYJG). or any of the options COL might want | Answered in Addendum 5 | | Will there be concrete drawing for the new Operators or concrete specs about the pad. Who is doing the Electrical work by owner. Contact Info. | Answered in Addendum 5 | | Can we price this Gate operator Auto chain link 300 in Lieu of the on the city spec out. | Answered in Addendum 6 | | Will the existing card reader conduits be adequate for required controls and FOB/Card Reader routing? Or will the contractor be required to install new conduits for controls and FOB/Card readers?? | Answered in Addendum 6 | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 4 | 07/20/2026 03:38 PM EDT | | | Addendum No. 1 | 06/26/2026 03:24 PM EDT | | | Addendum No. 2 | 06/29/2026 10:55 AM EDT | | | Addendum No. 3 | 06/29/2026 04:22 PM EDT | | | Addendum No. 5 | 07/22/2026 02:57 PM EDT | | | Addendum No. 6 | 07/28/2026 11:35 AM EDT | |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.