SLED Opportunity · OKLAHOMA · THE CITY OF OKLAHOMA CITY AND TRUSTS

    MAPS 4 MULTIPURPOSE STADIUM Bid Package 1.3 Electrical Material Supply

    Issued by The City of Oklahoma City and Trusts
    cityRFBThe City of Oklahoma City and TrustsSol. 8544150875
    Closed
    STATUS
    Closed
    due Apr 22, 2026
    PUBLISHED
    Mar 25, 2026
    Posting date
    JURISDICTION
    The City
    city
    NAICS CODE
    423610
    AI-classified industry

    AI Summary

    The City of Oklahoma City seeks qualified bidders for electrical material supply for the MAPS 4 Multipurpose Stadium project. Mandatory pre-bid conference on April 2, 2026. Electronic bids due April 22, 2026.

    Opportunity details

    Solicitation No.
    8544150875
    Type / RFx
    RFB
    Status
    Active
    Level
    city
    Published Date
    March 25, 2026
    Due Date
    April 22, 2026
    NAICS Code
    423610AI guide
    Agency
    The City of Oklahoma City and Trusts

    Description

    Prequalification. Public notice seeking qualified bidders for this project was issued on 28th of January, 2026 and again on 4th day of February, 2026. Only bidders qualified pursuant to that solicitation may bid on this contract. **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.MU.USA.2722754.C19106251 **Piggyback Contract**: No **Question Acceptance Deadline**: 04/15/2026 01:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: MAPS OFFICE **Reference Number**: 0000416970 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Construction Business Relationship Affidavit | Attach Notarized Construction Business Relationship Affidavit | Yes | Yes | | Construction Anti Non-Collusion Affidavit | Attach Notarized Construction Anti-Collusion Affidavit | Yes | Yes | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 04/02/2026 04:00 PM EDT | Location: LINGO Construction Services Office located at 1135 N. Robinson Ave., OKC, OK 73103 in Conf Rm 1 | Event Note: 103.01 – PRE-BID CONFERENCE 103.01.03.01 When specified in the Notice to Bidder, attendance at the Pre-Bid Conference is a prequalification requirement. If there is a virtual meeting option, the virtual address will be provided in the Notice to Bidders. When the Notice to Bidders specifies that the Pre-Bid Conference is mandatory, the contractor who plans to submit a bid must attend the Mandatory Pre-Bid Conference. Failure of the prospective bidders to attend a Mandatory Pre-Bid Conference will cause the bidder’s submission to be rejected. Whenever required, a Mandatory Pre-Bid Conference is a prequalification requirement to bid on the contract. **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---| | Next Sheet1 Next 1-Base Bid Code Description UOM Qty E00 1.3 Electrical Material Supply Lump-Sum 1 Next 2-Alternate 1 Code Description UOM Qty E00 Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 Next 3-Alternate 2 Code Description UOM Qty E00 Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 | Next 1-Base Bid Code Description UOM Qty E00 1.3 Electrical Material Supply Lump-Sum 1 | E00 | 1.3 Electrical Material Supply | Lump-Sum | 1 | | Next 2-Alternate 1 Code Description UOM Qty E00 Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 | E00 | Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | Next 3-Alternate 2 Code Description UOM Qty E00 Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 | E00 | Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | | | Next 1-Base Bid Code Description UOM Qty E00 1.3 Electrical Material Supply Lump-Sum 1 | E00 | 1.3 Electrical Material Supply | Lump-Sum | 1 | | | E00 | 1.3 Electrical Material Supply | Lump-Sum | 1 | | Next 2-Alternate 1 Code Description UOM Qty E00 Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 | E00 | Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | | E00 | Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | Next 3-Alternate 2 Code Description UOM Qty E00 Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 | E00 | Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | | E00 | Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | Code | Description | UOM | Qty | Code | Description | UOM | Qty | |---|---|---|---|---|---|---|---|---|---|---|---| | Next 1-Base Bid Code Description UOM Qty E00 1.3 Electrical Material Supply Lump-Sum 1 | E00 | 1.3 Electrical Material Supply | Lump-Sum | 1 | | | E00 | 1.3 Electrical Material Supply | Lump-Sum | 1 | | Next 2-Alternate 1 Code Description UOM Qty E00 Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 | E00 | Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | | E00 | Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | Next 3-Alternate 2 Code Description UOM Qty E00 Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. Lump-Sum 1 | E00 | Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | | | E00 | Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | E00 | 1.3 Electrical Material Supply | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | E00 | Alternate Cost A: Provide alternate total cost for this package to be provided with material delivery to jobsite by 1/26/27 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | E00 | Alternate Cost B: Provide alternate total cost for this package to be provided with material delivery to jobsite by 12/22/26 based upon notice to proceed, submittal deadlines, and authorization to proceed on the milestones above. | Lump-Sum | 1 |

    Key dates

    1. March 25, 2026Published
    2. April 22, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.