SLED Opportunity · WASHINGTON · CITY OF SEATTLE

    On-Call Land Surveying Services

    Issued by City of Seattle
    cityRFICity of SeattleSol. 242941
    Closed
    STATUS
    Closed
    due Apr 7, 2026
    PUBLISHED
    Mar 10, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    541370
    AI-classified industry

    AI Summary

    City of Seattle seeks qualifications for on-call land surveying services. Qualifications due by April 7, 2026. Questions due by March 20, 2026 via e-procurement portal.

    Opportunity details

    Solicitation No.
    242941
    Type / RFx
    RFI
    Status
    open
    Level
    city
    Published Date
    March 10, 2026
    Due Date
    April 7, 2026
    NAICS Code
    541370AI guide
    Jurisdiction
    City of Seattle
    Agency
    City of Seattle

    Description

    The City of Seattle is seeking qualifications for On-Call Land Surveying Services. Qualifications are due no later than 1:00 pm on Tuesday, April 7, 2026. All questions are to be submitted through the e-procurement portal at https://procurement.opengov.com/portal/seattle no later than 1:00 pm on Friday, March 20, 2026.

    Background

    Seattle Public Utilities (SPU) is requesting Statements of Qualifications from qualified Consultant Teams to provide On-Call Land Surveying Services. The Consultant is expected to deliver of a wide variety of infrastructure improvements, along with supporting Seattle Department of Transportation’s (SDOT) aggressive goals to construct pedestrian, bicycle, transit, roadway structure, traffic operations, and roadway improvements over the next ten years.

    SPU intends to award up to four (4) consultant teams, or more if deemed in SPU’s interest, to provide as-needed land surveying services.  No specific projects have been identified at this time.  Rather, individual scopes of work will be determined based on planning, priority and budget and will be negotiated with the consultant as funding becomes available. Those individual scopes of work are issued in a Work Assignment with varying scopes, dates for milestones and deliverables. Under no circumstances shall this contract or subsequent work assignments go beyond five (5) years (SMC 20.50.040 G).

    SPU does not guarantee any minimum quantity of work under this contract.

    Project Details

    • Reference ID: 25-239-S
    • Department: Seattle Public Utilities
    • Department Head: Andrew Lee (General Manager and CEO)

    Important Dates

    • Questions Due: 2026-03-20T20:00:00.000Z
    • Pre-Proposal Meeting: 2026-03-17T20:00:00.000Z — https://teams.microsoft.com/meet/2569929752222?p=vYCoQh0Pko28vmD7KU Meeting ID: 256 992 975 222 2 Passcode: Dh3Hc6tN Dial in by phone +1 206-686-8357,,985593653# United States, Seattle Find a local number Phone conference ID: 985 593 653#

    Addenda

    • Official Notice #1: Pre-Submittal Presentation & Attendee List (released 2026-03-17T21:28:38.027Z) —

      See attached Pre-Submittal Meeting Presentation and Attendee List for your use.

    • Official Notice #2: Questions and Answers 03/19/2026 (released 2026-03-19T17:41:55.800Z) —

      See attached for all questions (with answers) SPU received to date.

    • Official Notice #3: Questions and Answers 03/23/2026 (released 2026-03-23T15:24:19.242Z) —

      See attached for all questions (with answers) SPU received by the deadline on 03/20/2026.  

    Evaluation Criteria

    • Team Qualifications - Page Limit 4 (30 pts)

      Describe who the proposed team members (prime and subconsultants) are and why they are qualified to perform the work described in the scope of work. In your response,

      • Include the Project Lead (WA State Licensed Surveyor) in your team and provide a min. of three (3) surveying and mapping projects that highlights their experience. Include the client’s name in the project examples.
      • Identify individual(s) responsible for quality control\quality assurance
      • A description of each team members’ roles & responsibilities including any sub-consultants assigned to this contract. Include how they are qualified to perform the assigned tasks.
      • Provide each team members’ resumes, including sub-consultants. No more than one (1) page per person. Resumes are not included in the total page count.
    • Availability - Page Limit 1 (10 pts)

      Provide proposed team members’ availability over the duration of the contract.

    • Team Organizational Chart - Page Limit 1 (10 pts)

      A detailed consultant team organizational chart (including prime and sub consultants)

    • Project Examples/Experience - Page Limit 6 (40 pts)

      Describe your team’s experience with Land Survey Projects:

      In your project description, include the following:

      • Describe at least three (3) and not more than five (5) Land Survey projects completed within the last five (5) years that demonstrate your team members’ qualifications to complete the scope of work described in this solicitation. NOTE: Project examples may overlap with the project examples given under the Team Qualifications criterion.
      • Special considerations taken to produce successful results.
      • Describe your team’s qualifications integral to the success of those projects, any problems encountered and how solutions were developed and implemented during the completion of the scope of work.
      • Do not include projects completed by members that are not assigned to the proposed team.
    • WMBE Inclusion Plan - No Page Limit (10 pts)

      Evaluation of WMBE Inclusion Plan:

      Points are awarded for responses that evidence:

      • Responsible good faith efforts
      • Meaningful and attainable self-set aspirational goals, which are consistent with Consultant Team strategy
      • WMBE firms integrated into the team and within core work
      • WMBE firms integrated within value-added work opportunities
      • Evidence of strong past performance using effective models
      • Evidence of effective mentoring, training, or capacity-building

       

      • Core Services includes:
        • Project Management of Work.
        • Conventional Land Surveying/Topographic Survey.
        • Laser Scanning and Mapping.
        • UAS Photogrammetry\LiDAR.
        • Bathymetric Surveys.
        • Boundary Surveys.
        • Legal Descriptions with Exhibit Maps.
        • Control Surveys.
        • Settlement monitoring.
        • Quality Assurance and Quality Control of Work.
      • Non-Core Services Includes:
        • Rights of Entry.
        • Traffic Control Plans for Street Use Permit.

    Submission Requirements

    • Letter of Interest / Introduction - Page Limit 1 - Not Scored (required)

      One (1) page may be included as a cover sheet and/or cover letter or introduction. This will not be scored.

    • Submittal (required)
    • Minimum Qualifications (required)

      This response is mandatory. The determination you have achieved all minimum qualifications is made from this section alone, and therefore, the Evaluation Committee is not obligated to check references or search other materials in your proposal to make this decision.

      For each Minimum Qualification listed below, please describe how you meet the minimum qualification.

      Minimum Qualification #1
      Provide Minimum Qualification

      Minimum Qualification #2
      Provide Minimum Qualification

      Minimum Qualification #3
      Provide Minimum Qualification

    • Consultant Inclusion Plan (required)

      Please download the below documents, complete, and upload.

    • Consultant Questionnaire (required)

      Please download the below document, complete, and upload. 

      Provide information to the extent this information is available. If your response is incomplete or requires further description, the City may request additional information within a specified deadline, or may determine the missing information is immaterial.  

    • Contract Modifications

      Make requested changes to the Contract language using track changes and upload here.

    • Will there be minimum qualifications? (required)

      Are there qualifications the Consultants must have to even be considered?  Minimum qualifications should ONLY be those that the Consultant must meet to have their proposal considered, meaning you will toss the proposal out in full if the Consultant cannot meet the minimum qualifications. 

      Minimum qualifications can sometimes be important, such as a professional license.  If you require a Minimum Qualification, ensure it is fair, appropriate and reasonable. Consultants can protest these if they seem exclusionary and unnecessary.  In addition, some federal requirements may restrict or prohibit the use of such qualifications. Review the terms of the grant to ensure compliance with all such requirements. Minimum Qualifications are only for factual yes/no items which can be easily proven as a matter of fact and on the face of the RFQ response.  These are NOT subjective such as “Company needs to be experienced” or “needs to have good references.”  These are instead hard and fast criteria we check off “yes or no,” and we will toss them out without further consideration if they say no.

    • Will a Consultant Inclusion Plan be needed? (required)

      Note to departmentAll non-federally funded contracts above $395,000 require an Inclusion Plan. If potential work, including all phases, is above $395,000, retain the Inclusion Plan as a required submittal. The Mayor’s 2010 policy requires you to score the WMBE response, for no less than 10% of total points.

      Departments are encouraged to list the core Scope of Work items that the department has determined to be available for subcontracting.

      Contracts with FEDERAL FUNDING may require different or additional social equity requirements, such as federal Disadvantaged Business Enterprise (DBE) requirements, which are required for US DOT funded projects, such as FTA projects.  

      Exceptions: Exceptions to the Inclusion Plan requirement are rare. Departments must notify their WMBE IDT representative and PC for a review and written approval of an exception. An exception does not relieve the Consultant of its responsibilities to seek WMBE inclusion if changes to the contract provides opportunities for WMBE inclusion.

      For assistance, contact Miguel Beltran at Miguel.Beltran@Seattle.gov or 206-684-4525.

    • Are you open to negotiating the standard contract terms and conditions? (required)
    • Is this RFQ for architecture or engineering services per RCW 39.80? (required)

      State law requires the City to select the firm deemed to be the most highly qualified to provide A&E services. The City cannot ask for pricing before selecting the most highly qualified vendor. 

      Per RCW 18.08.320, Architecture includes: the rendering of any service or related work requiring architectural education, training, and experience, in connection with the art and science of building design for construction of any structure or grouping of structures and the use of space within and surrounding the structures or the design for construction of alterations or additions to the structures, including but not specifically limited to predesign services, schematic design, design development, preparation of construction contract documents, and administration of the construction contract. 

      Per RCW 18.43.020, Engineering is any professional service or creative work requiring engineering education, training, and experience and the application of special knowledge of the mathematical, physical, and engineering sciences to such professional services or creative work as consultation, investigation, evaluation, planning, design, and supervision of construction for the purpose of assuring compliance with specifications and design, in connection with any public or private utilities, structures, buildings, machines, equipment, processes, works, or projects. 

      Per RCW 18.96, Landscape Architecture is the rendering of professional services in connection with consultations, investigations, reconnaissance, research, planning, design, construction document preparation, construction administration, or teaching supervision in connection with the development of land areas where, and to the extent that, the dominant purpose of such services is the preservation, enhancement, or determination of proper land uses, natural land features, ground cover and planting, naturalistic and aesthetic values, the settings and approaches to structures or other improvements, or natural drainage and erosion control. This practice includes the location, design, and arrangement of such tangible objects as pools, walls, steps, trellises, canopies, and such features as are incidental and necessary to the purposes in this chapter. Landscape architecture involves the design and arrangement of land forms and the development of outdoor space including, but not limited to, the design of public parks, trails, playgrounds, cemeteries, home and school grounds, and the development of industrial and recreational sites. 

    Questions & Answers

    Q (Consultant Questionaire): Hi there, would you please provide a word document of the consultant questionnaire for ease of filling it out? Thank you

    A: Hi. If you go to Section 12 in the Project Documents tab, you'll see the Consultant Questionnaire in .DOC format. Let me know if you don't see it.


    Q (11X17 Org Chart): For evaluation criteria item 3 - Org chart, would you accept an 11X17 page size as the 1 page?

    A: We cannot accept an 11x17 inch page for the org. chart. Per Section 8.6A Qualifications Submittal in the RFQ, all pages are to be 8.5x11 inches.


    Q (WMBE Inclusion Plan): For evaluation criteria item 5 - WMBE Inclusion Plan, is this to be included solely on the Consultant Inclusion Plan Attachment 5? Or a section within the submittal IN ADDITION to the attachment 5 form?

    A: This should be included solely in the WMBE Inclusion Plan Attachment 5. We are informing bidders that your plan will be evaluated and points will be awarded based on the bulleted items.


    Q (No subject): On the Team Qualifications section, you state you'd like us to provide team members' resumes. Would SPU accept us providing 1-page resumes for key staff rather than all the staff provided in the organization chart in Section 3.

    A: As stated in the RFQ, team member resumes are not included in the page count. That being said, yes, SPU would accept 1-page resumes for key staff.


    Key dates

    1. March 10, 2026Published
    2. April 7, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.