Active SLED Opportunity · FLORIDA · CITY OF DELRAY BEACH

    Project No. 23-001 / Stormwater Master Plan

    Issued by City of Delray Beach
    cityRFPCity of Delray BeachSol. 9382204214
    Open · 14d remaining
    DAYS TO CLOSE
    14
    due Aug 19, 2026
    PUBLISHED
    Jul 20, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    541330
    AI-classified industry

    AI Summary

    City of Delray Beach seeks proposals for a Stormwater Master Plan to guide stormwater management and infrastructure improvements. Due August 19, 2026.

    Opportunity details

    Solicitation No.
    9382204214
    Type / RFx
    RFP
    Status
    Active
    Level
    city
    Published Date
    July 20, 2026
    Due Date
    August 19, 2026
    NAICS Code
    541330AI guide
    State
    Florida
    Agency
    City of Delray Beach

    Description

    Title: Project No. 23-001 / Stormwater Master Plan - Professional Engineering Services ... **Solicitation Type**: RFQ - Request for Qualifications (Formal) **Source ID**: PU.AG.USA.2731118.C18962626 **Piggyback Contract**: No **Question Acceptance Deadline**: 08/03/2026 05:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: Attachment A - RFQ 6.1 Forms must be filled out completely and must be attached to submittals for vendors to be responsive and responsible. **Owner Organization**: City of Delray Beach **Solicitation Number**: RFQ2026-036 **Reference Number**: 0000431094 **Pricing**: Lump sum **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Responses From Vendor | Documents Defining the Solicitation | Yes | No | **Questions and Answers**: | Question | Answer | |---|---| | In 4.2.4. TAB 4 – PROPOSER’S INFORMATION, subpoints M, N, a second point M, as well as O, P, Q, R, and S, are repeated requirements from subpoints E, F, G, H, I, J, K, and L of 4.2.3. TAB 3 – MINIMUM QUALIFICATIONS. Would the City consider striking the repeated requirements in 4.2.4. TAB 4 – PROPOSER’S INFORMATION? | Answered in Addendum 2 | | Does the 50-page limit include front/back covers, the table of contents, and tabs? Are there any restrictions on page margins or font size? | Answered in Addendum 2 | | For Section 4.2.5, Tab 5, Part C, could you please clarify whether the proposer must provide three client references for construction engineering and inspection consulting services or for stormwater consulting services? | Answered in Addendum 2 | **Addendums**: | Addendum | Date | Note | |---|---|---| | Addendum No. 1 | 07/24/2026 04:27 PM EDT | | | Addendum No. 2 | 07/24/2026 04:41 PM EDT | |

    Key dates

    1. July 20, 2026Published
    2. August 19, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.