Active SLED Opportunity · ARIZONA · ARIZONA SCHOOL DISTRICTS
AI Summary
Palominas Elementary School District #49 in Arizona seeks bids for trash removal services funded by M&O. The IFB emphasizes cost as the sole evaluation factor after responsiveness. Key dates include questions due by April 20, 2026, and bid opening on April 27, 2026. Strict compliance with submission requirements and service standards is required.
Palominas Elementary School District, #49 is in Cochise County serving our K-8 Community. This solicitation, Trash Removal Services for Palominas ESD, will be paid by the PESD's M&O funding.
| Event | Date | Location |
|---|---|---|
| Public Bid Opening of the electronic bids received will be held virtually immediately following the deadline. | 2026-04-27T20:00:00.000Z | Trash Services Bids due PESD Monday, April 27 · 1:00 – 1:05pm Time zone: America/Phoenix Google Meet joining info Video call link: https://meet.google.com/mfu-wwhv-tjr Or dial: (US) +1 419-853-6122 PIN: 916 715 227# More phone numbers: https://tel.meet/mfu-wwhv-tjr?pin=9914104543862 |
After being found both Responsive and Responsible, cost is the only factor.
Our firm understands that we are not to embed any documents within the questionnaire, as they will not be accessible or evaluated. Embedded Links will disqualify your response.
When a document is required to be uploaded, it must be in pdf format and unlocked (unless the firm will provide the key if they are the highest ranked firm.)
Our firm understands that we are not to embed any documents within our uploaded files, as they will not be accessible or evaluated.
Please download the below documents, complete, and upload.
The resulting contract is subject to all terms of the district procurement code including limitations as to duration, rights of the district to terminate and means of dispute resolution. No resulting contract is renewable except to the extent provided in the solicitation. No vendor terms take precedence over the solicitation and district procurement code.
Will all your employees and subcontractors have Fingerprint Clearance Cards/
Has your firm communicated pricing, strategies, or other deceptive communication to that could lead to a sham bid submittal?
Please provide a e-mail address (preferably a generic company e-mail address) where POs will be submitted for processing.
Please upload a scanned copy of your Bid Bond here. If you are the low bidder your hard copy bond must be in the hands of the district within 48 hours and dated on or before the bids were due.
The purpose of this question is to confirm the Bidder’s acknowledgement and acceptance of the following:
All exceptions or modifications to the Solicitation, regardless of whether the District approved such items prior to submission of the Offer, must be clearly set forth in this form.
How many front-load garbage trucks are in your current fleet that services Hereford/Sierra Vista area?
Will your firm comply with the pickup day of Wednesday or Thursday.
Any deviation or exception to information found within the solicitation must be identified below. Any deviation, exception or the inability of the vendor to comply with a particular item found within the IFB must be clearly and fully stated. Failure to list any deviations indicates full compliance with the solicitation.
Please download the below documents, complete, and upload.
Explanatory Note: The purpose of this form is to request that Palominas Elementary School District, #49 treat as confidential specific information in the Offer that the Offeror or Bidder believes is a trade secret or other proprietary information. All information that is the subject of the request for confidentiality must be designated on the page or pages of the Offer in which it appears. An explanatory statement for the request must be clearly set forth in this form. Additional pages may be attached to the form. The District Representative shall review the statement and provide the determination in writing whether the information shall be protected. If the District Representative determines that the information shall be protected from disclosure, the District Representative shall inform the Bidder or Offeror in writing of such determination. Requests to protect pricing information or the entire Offer from disclosure will be denied.
Please download the below documents, complete, and upload.
Contractor to confirm that DSF does not allow for change orders. Anything that is unclear must be addressed in the procurement phase of bidding.
The cost of materials could increase from bid date to PO date and would be discussed at the Preconstruction Meeting. Labor will not increase.
Please confirm.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Upload your Contractor's Warranty for two years after substantial completion.
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. This should be in days.
Name the major material and/or equipment and the current lead-time.
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Please upload any certifications here.
Upload your Contractor's Warranty for two years after substantial completion.
Please upload your Manufacturer's Intent to Warranty(s) for Weatherization Products
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. Per plans and specifications is not acceptable!
Name the major material and/or equipment and the current lead-time.
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Upload your Contractor's Warranty for two years after substantial completion.
Please upload your Manufacturer's Intent to Warranty(s) for the Roofing Project.
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. Per plans and specifications is not acceptable!
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project.
Name the major material and/or equipment and the current lead-time.
Upload your Contractor's Warranty for two years after substantial completion.
A completed Subcontractor form documenting all trades shall be included and submitted electronically within the Questionnaire section. You should list only one name for each branch/type of the work. All subcontractors shall be listed on this form. This form should be included even if your firm is self-performing 100% of the work and not utilizing any Subcontractor(s). Your bid is non-responsive if any firms are unlicensed.
Please download the below documents, complete, and upload.
Fill in the space to indicate you understand the scope of work to include the major trades and steps. This not a short answer. Per plans and specifications is not acceptable!
Name the major material and/or equipment and the current lead-time.
On your letterhead, a schedule based on Notice to Proceed through Substantial Completion should be provided and include milestones for the project. A statement of the number of days is not acceptable. Your schedule must include the current lead time for materials for this project. This should be a Gantt style response.
Please upload the specification data sheets for all the major components of materials that you propose to use to meet the drawings and specifications of this project.
Please download the below documents, complete, and upload.
ATTENTION: Architects, Engineers, Consultants, Contractors, Sub- contractors, Craftsmen and Vendors. The following information is extremely important and must be adhered to without exception:
Asbestos Contained Building Materials (ACBM) will not be used on any project within the Palominas Elementary School District, #49. ACBM is defined as any building material having an asbestos content of 1% or more. Typical examples of materials that may contain asbestos and therefore would be considered ACBM are: vinyl asbestos tile, certain forms of adhesive used to hold vinyl tile, certain forms of adhesive used to hold cove base molding, some thermal insulation, and transite paneling. The above list is not complete but merely represents some of the material more commonly found on job sites that are ACBM. As per EPA guidelines, some roofing material used on the exterior of the buildings may be considered ACBM.
Solder and paint with any amount of lead is no longer authorized, and will not be used in any District projects.
HOLD HARMLESS: Interface of work under this contract with work containing asbestos shall be executed by the contractor at risk and discretion with full knowledge of the currently accepted standards, hazards, risks and liabilities associated with asbestos work and asbestos containing products. By execution of this contract, the contractor acknowledges the above and agrees to hold harmless the owner, employees and agents and assigns for all asbestos liability which may be associated with respect to the above-mentioned standards, hazards, risks and liabilities.
I have read the above information and will comply.
What is your current bonding capacity?
Upload a copy of your AROC License.
From call to arrive, what is the response time or hour if it is the next day:
Call received at 6:00 AM from Name of a District
Call received at 4:00 pm from Name of a District
Call received at Noon from Name of a District
Please download the below documents, complete, and upload.
Please download the below documents, complete, and upload.
The completed form should be notarized and included in the bid package to attest that your firm and its employees are not related in any way to the District, its staff, nor that of the members of the Governing Board.
Please download the below documents, complete, and upload.
Please upload your offer and acceptance form here.
ALL UNSIGNED RESPONSES SHALL BE REJECTED.
Please download the below documents, complete, and upload.
This Drug-Free Workplace Certification is required pursuant to Government Code §8350, et seq., the Drug-Free Workplace Act of 1990. The Drug-Free Workplace Act of 1990 requires that every person or organization awarded a contract for the procurement of any property or services from any State agency must certify that it will provide a drug-free workplace by doing certain specified acts.
I acknowledge that I am aware of the provisions of Government Code §8350, et seq. and hereby certify that I will adhere to the requirements of the Drug-Free Workplace Act of 1990.
Please download the below documents, complete, and upload.
Please upload your notarized Non-Collusion Affidavit here
Please upload your complete W-9 here.
Please upload your complete COI here.
Please enter your SAM Unique ID Number here.
To the extent applicable, Palominas Elementary School District, #49 is prohibited by A.R.S. § 35-393.01 from entering into a contract with any company for professional services unless the contract with the company includes a written certification that the company is not currently engaged in, and will not, for the duration of the contract, engage in a boycott of Israel. By submitting a Response, a Respondent represents to PESD that it is not currently engaged in a boycott of Israel and that it will agree to language in the contract prohibiting any such boycott for the duration of the contract
Pursuant to A.R.S. § 35-394, written certification is required to show that the company entering into a contract with a public entity does not use the forced labor, or any goods or services produced by the forced labor, of ethnic Uyghurs in the People's Republic of China.
Under A.R.S. § 35-394:
1. "Company" means an organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, including a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate, that engages in for-profit activity and that has ten or more full-time employees.
2. "Public entity" means this State, a political subdivision of this State or an agency, board, commission or department of this State or a political subdivision of this State.
In compliance with A.R.S. §§ 35-394 et seq., all offerors must select one of the following:
Upload your completed Federal Compliance Form found in the #Attachments
Confirm that the following know and understand the requirements of the requirements of Certified Payrolls.
Please type in the school district name here to auto populate throughout the solicitation
Protest Person, and title
What is the Business Manager's Name?
What is the Business Managers Phone #
What is the Business Managers Email Address
Please enter the School District Initial (SDI)
Please choose all that apply
Does the District have teacherage?
Will you accept partial Bids?
Please enter the design firm's name here.
Please enter the name of the design rep
How many days from NTP
How many days from NTP until Final Completion
Please enter the A/P Address invoices will need to be sent to
Example: 143 S. Alma School Road, Mesa, AZ 85201
Do you need an Electronic Pricing Table for this solicitation?
What is the name of the school
What is the address of the School?
Has it been done?
If yes this will need Certification and Visual Inspections
Is this on the Rez
Does this require a Bid bond?
Is this a Division of School Facilities Funded Project?
Please check all you will require in Special Terms and Conditions
Where are the funds coming from?
Yes or no
Well, treatment plant, sewer system, etc
Flooring, doors, windows, grading and drainage?
Q (Penalties Spillage):
A: Spillage / “Failure to collect spilled materials” • How will responsibility be determined between contractor handling vs. improperly bagged or loose waste placed in containers by users? • Will the District implement or enforce bagging requirements to minimize spillage? The District requires all trash to be properly bagged. In the event that materials are spilled as a result of dumping activities or from the contractor’s vehicle, it is the responsibility of the contractor’s driver to promptly clean up and remedy the situation.
Q (Penalties Missed Collection):
A: Missed Collection – 1 Business Day Requirement • How are situations handled where service cannot be completed due to lack of access (e.g., locked gates, blocked containers, vehicles in front of bins)? • Will documented access issues be exempt from penalties? Two (2) sites have locked gates where refuse bins are located. The awarded contractor will be provided keys for access. Any documented access issues that prevent service will be exempt from associated penalties.
Q (Leakage from Contractor Vehicles or Contents):
A: Will service locations be cleaned or documented prior to contract start to establish baseline conditions? What method will be used to determine whether leakage originated from the contractor’s vehicle versus existing site conditions or improperly disposed waste? Prior to commencement of services, the awarded contractor and the District shall jointly visit each site to establish a baseline for service levels, which will be used to evaluate ongoing performance and compliance.
Q (Container Repair / Replacement (3 Business Days)):
A: What conditions require full container replacement versus on-site repair (e.g., lid replacement, minor damage)? Will on-site repairs that restore functionality be considered compliant? Repairs may be performed on-site, provided such work does not interfere with the operation of the educational process. If the County Health Inspector determines that a bin must be replaced, the awarded contractor shall replace the bin within three (3) calendar days of notification.
Q (Collection on a Different Day Than Scheduled):
A: Will penalties apply in cases where rescheduling is required due to conditions outside contractor control (e.g., blocked access, safety concerns)? Will documented exceptions be excluded? Documented exceptions, including but not limited to floods or wildfires, shall be excluded from performance requirements and associated penalties.
Q (Penalties Appeals):
A: Is there an appeal or review process for disputed penalties? The district is reasonable and will review any appeals with the awarded firm.
Q (Current Contract): Can you include a copy of the current pricing schedule or contract?
A: Current pricing is not relevant to any firms response.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.